Laserfiche WebLink
<br /> <br />-. <br />. <br /> <br />,~ <br />'. <br /> <br />uDOI02 <br /> <br />PROJECT FEATURES: <br /> <br />Reservoirs <br />Juniper <br />Jubb <br />California Park <br />Rampart <br /> <br />Height <br />dam <br />(ft.) <br />225 <br />60 <br />101 <br />65 <br /> <br />Canals <br />Maybell <br />Sunbeam <br />Axial <br />Deception <br />Elkhead <br />Fortification <br /> <br />Juniper powerplant and switchyard <br />Axial pumping plant <br /> <br />COSTS: (preliminary) <br /> <br />Surface <br />area <br />(acres) <br />25,000 <br />120 <br />850 <br />350 <br /> <br />Length <br />(miles ) <br />26 <br />37 <br />26 <br />9 <br />38 <br />25 <br /> <br />Active <br />capacity <br />(ac.-ft.) <br />1,030,000 <br />2,000 <br />35,000 <br />6,500 <br /> <br />Juniper dam and reservoir <br />Jubb dam and reservoir <br />California Park dam and reservoir <br />Rampart dam and reservoir <br />Maybell canal <br />Sunbeam canal <br />Axial canal <br />Deception canal <br />Elkhead canal <br />Fortification canal <br />Powerplant, switchyard~ and transmission lines <br />Axial pumping plantl <br />Laterals and drains <br />Total <br />Interest during construction (3 1/8%--8 yrs.) <br />Total <br />Specific recreation costs <br />Total initial investment <br /> <br />2 <br /> <br />Total <br />capacity <br />(ac.-ft.) <br />1,970,000 <br />2,250 <br />36,000 <br />7,500 <br /> <br />Capacity <br />(second-feet) <br />260 <br />130 <br />325 <br />100 <br />145 <br />75 <br /> <br />30,000 kilowatts <br />25,000 horsepower <br /> <br />$15,332,000 <br />600,000 <br />1,939,000 <br />1,502,000 <br />1,907,000 <br />760,000 <br />5,448,000 <br />1,900,000 <br />1,323,000 <br />625,000 <br />12,520,000 <br />3,870,000 <br />5.978.000 <br />$53,704,000 <br />6.713.000 <br />$60,417,000 <br />788.000 <br />$61,205,000 <br />