Laserfiche WebLink
<br />0022u7 <br /> <br />~ <br /> <br />( <br /> <br />Durango Pumoing Plant - Stage I <br /> <br />SECTION 01330 - SUBMITTALS <br /> <br />PART 1 <br /> <br />GENERAL <br /> <br />1.01 COST <br /> <br />A. Include cost in prices offered in the schedule for other items of work. <br /> <br />1.02 DEFINITIONS <br /> <br />A. Days: Calendar days. <br /> <br />B. Required Submittal Number (RSN): RSN identifies items to be submitted together as a <br />complete submittal. <br /> <br />1.03 SUBMITTAL REQUIREMENTS <br /> <br />A. In case of conflict between requirements of this section and requirements included <br />elsewhere in these specifications, requirements included elsewhere take precedence. <br /> <br />B. Professional Certifications: <br />1. Sign and seal submittals requiring certification by a registered professional. <br /> <br />C. <br /> <br />Drawings and Data: <br /> <br />1. Prepare drawings and data in English. <br /> <br />2. Label drawings and data with Bureau of Reclamation contract number and RSN. <br /> <br />3. Mark items to be furnished on manufacturer's data for commercial products or <br />equipment, such as catalog cut sheets. Identity manufacturer's name, type, model, <br />size, and characteristics. Illustrate that product or equipment meets requirements <br />of specifications. <br /> <br />4. Drawings: <br /> <br />a. Minimum identification in title block: <br /> <br />1) Bureau of Reclamation contract number and title. <br /> <br />2) Contractor's or supplier's title and drawings number. <br /> <br />b. Size: D size or smaller. <br /> <br />c. Draw to scale with neat lettering using drafting equipment or computer <br />drafting equipment. <br /> <br />d. Measurement units: US Customary Units. <br /> <br />e. Final drawings: <br /> <br />I) AUTOCAD@ format (.dwg) or Drawing Transfer Format (.dxf) on <br />3-1/2 inch diskette or 74 min/65 0 MB CD-ROM disc. <br /> <br />Sobmittals <br />01330 - 1 <br />