Laserfiche WebLink
<br />002255 <br /> <br />Durango PurnDing Plant - Stage 1 <br /> <br />SECTION 01111 - DRAWINGS <br /> <br />~ <br /> <br />PART 1 <br /> <br />GENERAL <br /> <br />1.01 QUALITY ASSURANCE <br /> <br />A. Inform the Contracting Officer of any discrepancies, errors, or omissions discovered on <br />drawings in accordance with clause at FAR 52.236-21 - Specifications and Drawings for <br />Construction. <br /> <br />1.02 PROJECT CONDITIONS <br /> <br />A. Where there are minor differences as determined by the Contracting Officer between <br />details and dimensions shown on drawings and details and dimensions of existing <br />features at jobsite, use details and dimensions of existing features at jobsite. <br /> <br />1.03 INFORMATIONAL DRAWINGS <br /> <br />A. Some drawings are marked "for information only" in the drawing list and are included to <br />show some feature about which additional knowledge is required for bidding. <br /> <br />B. <br /> <br />If there are differences as determined by the Contracting Officer between details and <br />dimensions shown on these drawings and those of existing features at jobsite, use details <br />and dimensions of existing features at jobsite. <br /> <br />1.04 COPIES OF DRAWINGS <br /> <br />A. One set of full-size drawings, except standard drawings, will be furnished to the <br />Contractor for construction purposes. <br /> <br />B. Additional half-size copies of standard drawings will be furnished upon request to the <br />Contractor for construction purposes. <br /> <br />1.05 LIST OF DRAWINGS <br /> <br />A. Drawings listed in Table OllIlA - List of Drawings, are made a part of these <br />specifications. <br /> <br />PART 2 <br /> <br />PRODUCTS <br /> <br />Not Used <br /> <br />PART 3 <br /> <br />EXECUTION <br /> <br />Not Used <br /> <br />Drawings <br />01111.1 <br />