My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC07461
CWCB
>
Water Supply Protection
>
Backfile
>
19000-19999
>
WSPC07461
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:11:06 PM
Creation date
10/9/2006 6:29:13 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106.A.1.c
Description
Colorado River Water Projects - Animas La Plata - Description - Construction - Durango Pump Station
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
10/7/2002
Author
DOI-BOR
Title
Durango Pumping Plant - Stage I - Project Specifications - Volume III-A
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />002253 <br /> <br />Dorango Pumoing Plant - Stage I <br /> <br />SECTION 01110 - SUMMARY OF WORK <br /> <br />~ <br /> <br />PARTl <br /> <br />GENERAL <br /> <br />1.01 LOCATION <br /> <br />A. Work is located at Durango, Colorado in La Plata County. <br /> <br />1.02 PRINCIPAL COMPONENTS OF WORK <br /> <br />A. Site Construction: <br /> <br />1. Constructing and removing cofferdams <br /> <br />2. Constructing temporary water barriers. <br /> <br />3. Excavation for the intake structure, Durango Pumping Plant, air chamber, fish <br />bypass outlet, bypass pipeline, and flow meter structure. <br /> <br />4, Constructing rock berms. <br /> <br />5, Furnishing and installing 33-inch diameter HDPE bypass pipe and performing <br />related earthwork. <br /> <br />B. Concrete: <br /> <br />I <br />'. <br /> <br />I <br /> <br />I. <br /> <br />Constructing fish bypass outlet structure and approximately thirty feet of the <br />intake structure. <br /> <br />C. Miscellaneous metalwork: <br />I. Furnishing and installing embedded metalwork. <br /> <br />D. Equipment: <br />I. Furnishing and installing bulkheads and bulkhead guides for the intake structure. <br />2. Furnishing crest gates for the intake structure, including electrical conduit. <br />3. Furnishing and installing trashracks for the intake structure <br />4. Furnishing and installing outlet stoplog seat for the fish bypass outlet structure. <br /> <br />E. Special construction: <br />I. Providing corrosion monitoring system for fish bypass pipeline. <br /> <br />PART 2 <br /> <br />PRODUCTS <br /> <br />Not Used <br /> <br />Sommary of Work <br />01110-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.