My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC07458
CWCB
>
Water Supply Protection
>
Backfile
>
19000-19999
>
WSPC07458
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:11:05 PM
Creation date
10/9/2006 6:29:11 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8064.100
Description
Ute Tribes
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
6/1/1987
Author
Boyle Engineering
Title
Agricultural Engineering Study - McElmo Watershed - Final Report - Design-Cost Estimate for Off-Farm Irrigation Facilities and PIA Determination
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1308 <br /> <br /> <br />presently irrigated lands on Ute Mountain Ute Indian lands. W. W. <br /> <br /> <br />Wheeler & Associates, Inc., hydrology consultant, identified from <br /> <br /> <br />aerial photographs and other information available to them the lands <br /> <br /> <br />presently irrigated and provided to Boyle a marked print of the base <br /> <br /> <br />map. The amount of irrigated acreage was then planimetered from the <br /> <br /> <br />base map and tabulated. <br /> <br />For the remaining irrigable parcels, an analysis was made to <br /> <br />determine the residual water payment capacity when only the off-farm <br />static pumping lift costs where added to the on-farm costs identified <br />in Task B. Based on the elevation of the nearest water supply and the <br />elevation of the highest point in each parcel, the static lift to <br />serve the parcel was calculated using the computer program developed <br /> <br /> <br />for the Task B report. The power cost to lift the annual water <br /> <br /> <br />requirement to each field was then calculated assuming a 75 percent <br /> <br /> <br />pumping plant efficiency which is a conservatively high assumption; <br /> <br /> <br />and a field delivery pressure of 60 psi for all but gravity irrigated <br /> <br /> <br />fields. <br /> <br />It should be noted that the parcel water payment capacity residual <br />analysis (Appendix D) was slightly modified from the analysis <br />presented in the Task B draft report. Land leveling costs for <br />gravity irrigated fields were not included in the Task Bon-farm <br />costs. The Task B report, however, estimated land leveling <br />quantities in the range of one foot average cuts at a cost of $0.50 to <br />$1.00 per cubic yard. As a conservatively low estimate, an average <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.