Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1304 <br /> <br />TABLE OF CONTENTS <br />FINAL REPORT <br />McE1MO WATERSHED <br /> <br /> Page <br />D.l GENERAL 1 <br />D.2 SELECTION OF PARCELS FOR OFF-FARM DESIGN 2 <br />D.3 OFF-FARM IRRIGATION TRANSMISSION <br /> SY STEM COST 4 <br /> D.3.1 General 4 <br /> D.3.2 Pumping Stations 4 <br /> D.3.3 Pipelines 5 <br /> D.3.4 River Diversion Structures 5 <br /> D.3.5 Other Costs 7 <br /> D.3.6 Other Costs Not I ncl uded 8 <br />D.4 PRELIMINARY PRACTICABLE IRRIG ABL E ACREAGE 8 <br /> <br />D.4.1 Existing Irrigated Lands <br /> <br />8 <br /> <br />D.4.2 Water Supply <br /> <br />8 <br /> <br />D.4.3 Cropping Pattern <br /> <br />9 <br /> <br />D.4.4 Preliminary PIA Analysis <br /> <br />9 <br /> <br />D.4.5 Practicably Irrigable <br />Acreage Determination <br /> <br />13 <br /> <br />APPENDICES <br /> <br />Appendix D.l preliminary PIA Analysis <br /> <br /> <br />")"1.:- <br /> <br />. <br />