My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC07458
CWCB
>
Water Supply Protection
>
Backfile
>
19000-19999
>
WSPC07458
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:11:05 PM
Creation date
10/9/2006 6:29:11 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8064.100
Description
Ute Tribes
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
6/1/1987
Author
Boyle Engineering
Title
Agricultural Engineering Study - McElmo Watershed - Final Report - Design-Cost Estimate for Off-Farm Irrigation Facilities and PIA Determination
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />13. i\ <br />1'.1 <br /> <br />involving storage reservoirs. <br /> <br />0.4.3 Cropping Pattern <br /> <br /> <br />For the preliminary analysis of PIA, a cropping pattern with the <br /> <br /> <br />highest net agricultural returns was used. Table 0.2 identifies <br /> <br /> <br />this cropping pattern as well as the net agricultural return. Lands <br /> <br /> <br />in the McElmo Watershed were located within climatic Zones 0 and E. <br /> <br />0.4.4 Preliminary PIA Analysis <br />A preliminary PIA analysis was performed comparing a parcel's <br />payment capacity with a preliminary estimate of the cost to pump <br />!, <br />water from the river to the parcel. This preliminary water cost was <br />based on the static pumping lift (the difference in ~levation from <br />the water surface in the river to the elevation of the parcel) for <br />gravity irrigated fields or plus a field delivery pressure of 60 psi <br />for sprinkler irrigation. Detailed tabulations of the analysis are <br />shown in Appendix 0.1. Table 0.3 identifies only those parcels with <br />a positive residual payment capacity requiring further <br />consideration. A total of 13 parcels covering 495 acres showed an <br />initial positive residual payment capacity. <br /> <br />An off-farm irrigation transmission system was designed for those <br /> <br /> <br />parcels showing an initial positive residual payment capacity. <br /> <br /> <br />Those calculations are shown in Appendix 0.2 and summarized in Table <br /> <br /> <br />0.4. Parcels with an initial positive payment capacity after <br /> <br /> <br />comparing the residual payment capacity to the cost of water were <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.