Laserfiche WebLink
<br />II <br /> <br />"- ~ <br />" .fWIf:J8 <br /> <br />r <br /> <br />. ,.. <br /> <br />, <br /> <br />) <br /> <br />PLANS FOR COMING MONTH <br /> <br />The projectactiv1ties during March, 1946, will be lS.rgel,- <br />centered on negotiating a rsp~ent contract with the Conejos Water <br />Conservancy District, test well drilling on the Closed Basin Division, <br />water suppl,- studies in connection with the transmountain diversions, <br />preparation of a supplemental report for ,the Conejos and Rio Grande <br />Divisions, and surveys and estimates for highway relocations around <br />Counsellor Dam. <br /> <br />_AM~ <br />~rYM: it/ester <br />Project Engineer <br />Bureau of Reclamation <br />