My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC07441
CWCB
>
Water Supply Protection
>
Backfile
>
19000-19999
>
WSPC07441
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:10:59 PM
Creation date
10/9/2006 6:28:31 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Basin-Colorado River Computer Models-Colorado River Decision Support System
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
8/5/1996
Author
Ray Bennett
Title
Phase IIIa-White River Basin Enhancements- Memorandum-Subtask 2.02-White River Map Preparation
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br />-. <br /> <br />J'lOI'I"'J:"l <br />.~ u ,~~...~'" <br /> <br />~c7S / <br /> <br />Draft <br /> <br />L-C- <br /> <br />~ <br /> <br />August 5,1996 <br /> <br />MEMORANDUM <br /> <br />To: <br />From: <br />Subject: <br /> <br />File <br />Ray R. Bennett <br />Subtask 2.02 White River Map Preparation <br /> <br />Introduction <br /> <br />This memo describes the results of Subtask 2.02, White River Map Preparation. The <br />objective of this task was as follows: <br /> <br />Prepare an electronic and hard copy map of irrigated lands, head gates, <br />hydrology and base flow nodes, differentiating between that modeled in Phase II <br />and remaining to be modeled in Phase III <br /> <br />Approach and Results <br /> <br />Prepare Map As presented on Exhibit 1, a digital and hard copy map of the White <br />River Basin has been prepared which contains the following: <br /> <br />. River basin boundary, <br /> <br />. 500K Hydrology, <br /> <br />. Base flow locations, <br />. Structures and lands modeled explicitly in Phase II, <br />. Structures and lands to be added and modeled explicitly in Phase III, <br />. Structures and lands to be modeled as an aggregated demand in Phase III. <br /> <br />Comment <br /> <br />The following should be noted: <br /> <br />. Irrigated lands presented in Exhibit 1 include only those irrigated (with an irrigation <br />flag) that have a cropland designation (type 1-9). They do not include infrequently or <br />historically irrigated lands. <br />
The URL can be used to link to this page
Your browser does not support the video tag.