My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC07347
CWCB
>
Water Supply Protection
>
Backfile
>
19000-19999
>
WSPC07347
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:10:30 PM
Creation date
10/9/2006 6:25:15 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.39.C
Description
Colorado River Threatened-Endangered - RIPRAP - CFOPS - Water Availability
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
9/1/2000
Author
Brown and Caldwell
Title
Phase 1 Coordinated Facilities Water Availability Study for the Endangered Fishes of the Upper Colorado River - 09-01-00
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />002988 <br /> <br />. Institutional considerations including support or oppOSItIOn by varIOUS stakeholders, <br />conflicts with existing stakeholders/institutions, etc. <br /> <br />. Required Federal, state and local permits for implementation of the alternative. <br /> <br />Descriptions and analysis of the following alternatives are presented. <br /> <br />1. Expanded Coordinated Reservoir Operations <br />a. Green Mountain Reservoir Operations <br />b. Ruedi Reservoir Operations <br />c. Ruedi Reservoir Pumpback <br />d. CBT West Slope Facilities Operations <br />e. Denver Water Systems Operations <br />f. Bypass Diversions to Storage <br />g. Reduce Constraints on Existing CROP <br />2. Grand Valley-Centric Alternatives <br />a. Gunnison River Diversion into OMID Canals <br /> <br />b. Replace OMID Hydraulic Pumps With Electric Pumps <br />c. Pumping into GVIC System from Colorado River Below IS-Mile Reach <br />3. Efficiencies of Conveyance and Distribution Facilities <br />a. NCWCD <br />b. SECWCD <br /> <br />c. Municipalities <br />d. Reanalysis of Grand Valley Water Management Project <br />e. Analysis of GVIC Water Management <br />4. New Storage Projects <br />a. Above Shoshone: Reconfigured Eagle-Piney Project <br />b. Above Shoshone: Ranch Creek Reservoir <br /> <br />c. Above Shoshone: Wolcott Reservoir <br />d. Above Shoshone: Eagle Colorado Project <br />e. Above Shoshone: Jasper Reservoir <br />f. Below Shoshone: Roan Creek Reservoir <br />g. Below Shoshone: Mt. Logan Reservoir <br />h. Below Shoshone: Owens Creek Reservoir <br /> <br />p:\data\gen\Ocwcb\ 18133\report\phase-1 \chap- 3 .doc <br /> <br />3-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.