My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC07347
CWCB
>
Water Supply Protection
>
Backfile
>
19000-19999
>
WSPC07347
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:10:30 PM
Creation date
10/9/2006 6:25:15 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.39.C
Description
Colorado River Threatened-Endangered - RIPRAP - CFOPS - Water Availability
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
9/1/2000
Author
Brown and Caldwell
Title
Phase 1 Coordinated Facilities Water Availability Study for the Endangered Fishes of the Upper Colorado River - 09-01-00
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />002939 <br /> <br />CHAPTER 1 <br /> <br />INTRODUCTION AND PURPOSE <br /> <br />1.1 GENERAL <br /> <br />The primary purpose of this report is to sununarize the preliminary evaluation of alternatives for <br />supplying an annual average of 20,000 acre-feet of water to the mainstem Colorado River. This <br />water will be made available to supplement spring peak flows in the reach of the Colorado River <br />IS miles upstream from its confluence with the Gunnison River to the GVIC Diversion Dam near <br />Palisade, Colorado (the "IS-Mile Reach"). A secondary purpose is to sununarize the preliminary <br />evaluation of alternatives for providing flow enhancements to the IS-Mile Reach during the late <br />summer/early fall (July IS through October 31) period. <br /> <br />, i <br /> <br />Providing this water is an identified element of the Final Programmatic Biological Opinion <br />(U.S. Fish and Wildlife Service, December 20, 1999), The PBO specifies actions designed to <br />offset the impacts of all water depletions that have historically occurred, and a specified level of <br />depletions (~p to 120,000 acre-feet) that will occur in the future, upstream from the lower <br />terminus of the IS-Mile Reach. Persons or entities with projects upstream from the IS-Mile <br />Reach requiring a federal permit or federal action that would invoke the jurisdiction of the U. S. <br />Fish and Wildlife Service (Service) under!j7 of the Endangered Species Act (a "federal nexus"), <br />may rely on actions identified in the PBO as a Reasonable and Prudent Alternative (RPA) to <br />avoid jeopardy to, or adverse modification of critical habitat for, the four Colorado River fish <br />species listed under the Act. <br /> <br />)o'j <br /> <br />~ <br /> <br />The PBO identifies the IS-Mile Reach as important for the survival and recovery of the listed <br />species. The PBO also identifies providing adequate flows in the IS-Mile Reach, in combination <br />with other recovery actions, as important to achieving recovery of the listed species. In <br />particular, with regard to this report, the Service has identified enhancement of spring peak flows <br />in the IS-Mile Reach as assisting in habitat formation and maintenance, The Service identified <br />target peak flows in the IS-Mile Reach of 12,900 to 26,600 cfs as important to mobilize <br />gravel/cobble substrate. Management activities to enhance spring peak flows are expected to <br />result in an increased frequency of years in which flows exceed 12,900 cfs. The Service has also <br />identified enhancement of flows in the late irrigation season (July through October) as important <br />because flows in the IS-Mile Reach are significantly reduced by agricultural operations in the <br />Grand Valley, <br /> <br />One of the management elements identified in the PBO is the subject of this report, The PBO <br />states: <br /> <br />"The intent is to provide additional water up to approximately 20,000 acre-feet <br />per year of water for spring peak flow enhancement, without diminishing project <br />yield or causing project sponsors to incur significant costs, When additional <br /> <br />p:\data\gen\Ocwcb\ 18133\report\phase-1 \chap-I.doc <br /> <br />I-I <br />
The URL can be used to link to this page
Your browser does not support the video tag.