My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC07347
CWCB
>
Water Supply Protection
>
Backfile
>
19000-19999
>
WSPC07347
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:10:30 PM
Creation date
10/9/2006 6:25:15 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.39.C
Description
Colorado River Threatened-Endangered - RIPRAP - CFOPS - Water Availability
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
9/1/2000
Author
Brown and Caldwell
Title
Phase 1 Coordinated Facilities Water Availability Study for the Endangered Fishes of the Upper Colorado River - 09-01-00
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />OQ2902 <br /> <br />CONTENTS <br /> <br />Page <br /> <br />4.3.7 Alternative 5: Power Plant Operations and Scheduling.................................... 4-10 <br />4.3.7.1 Alternative 5a: East Slope Power Operations.................................... 4-10 <br />4.3.7.2 Alternative 5b: Shoshone Power Plant .............................................. 4-10 <br />4.3.7.3 Alternative 5c: Grand Valley Power Plant......................................... 4-11 <br />4.3.8 Alternative 6a: Insurance Pool.......................................................................... 4-11 <br />4.3.9 Alternative 6b: Obtain Historic Consumptive Use Credits............................... 4-11 <br />4.4 POLICY INVESTIGATIONS: PARTICIPATION INCENTIVES ................................ 4-11 <br />4.5 PHASE 2 SCOPE OF WORK.............................................................:............................4-14 <br /> <br />4.5.1 General... .........;.. ,......., ....... ....... .................... .... ..... ... ..... ...... .... .......,., .... ............ 4-14 <br />4.5.2 Task 1: Develop Model For Analysis of Alternative la, Green <br />Mountain Reservoir Operations ............................................,.......,..............4-14 <br />4.5.3 Task 2: Revise Model for Alternatives Ie, Denver Water System <br />Operations and 1 g, Reduce Coordinated Reservoir Operations ..... ........ ..... 4-16 <br />4.5.4 Task 3: Revise Model to InvestigateAlternative 5a, East Slope Power <br />Operations, and Alternative 6a, hi.surance PooL....................................... 4-17 <br />4.5.5 Task 4: Revise Model to Investigate Alternative I b, Ruedi Reservoir <br /> <br />Operations ... ..... ......., ............. ..... ......... ........ ..... .... .............................,....... ... 4-17 <br />4.5.6 Task 5: Revise Model to Investigate Alternatives 3d, Reanalysis of Grand <br />Valley Water Management; 3e, Reanalysis of GVIC Water Management; <br />5b, Shoshone Power Plant.........................................................:..................4-17 <br />4.5.7 Task 6: Final Revision of Any Model Used in Tasks I through 5 and Final <br /> <br />Production Runs.,....,.. ......... ........... ......, ..... ... ...... ........,......... ....................... 4-17 <br />4.5.8 Task 7: Analysis of Water Rights, Administration, Legal, Institutional, <br />and Permitting Considerations Associated with Alternatives Analyzed in <br /> <br />Tasks I through 6 .................,.......................,...............................................4-18 <br />4.5.9 Task 8: Cost Analysis of All Alternatives Analyzed in Tasks I through 6 ...... 4-19 <br />4.5.1 0 Task 9: Reconnaissance Level Engineering and Cost Analysis of New <br />Storage Projects Below Shoshone ............................................................... 4-19 <br />4.5.11 Task 10: Preliminary Ranking of Alternatives ................................................. 4-20 <br />4.5.12 Task 11: Develop Incentives for Implementation............................................. 4-20 <br />4.5,13 Task 12: Prepare Draft Phase 2 Report............................................................. 4-20 <br />4.5.14 Task 13: Prepare Final Report .......................................................................... 4-20 <br />4.5.15 Task 14: Meetings .....,.,...... ............... ............... ...... ............. .... ..... .....,.... ... ... ..... 4-20 <br /> <br />CHAPTER 5 REFERENCES ..........,........,.....,.,.......................,................................................. 5-1 <br /> <br />LIST OF TABLES <br /> <br />Table I Alternatives Evaluation Matrix <br /> <br />Table 2 Summary of Alternatives <br /> <br />p:\data\gen\Dcwcb\18133\report\phase-l \contentsdoc <br /> <br />IV <br />
The URL can be used to link to this page
Your browser does not support the video tag.