My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC07048
CWCB
>
Decision Support Systems
>
DayForward
>
WSPC07048
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2011 2:59:46 PM
Creation date
10/9/2006 6:14:06 AM
Metadata
Fields
Template:
Decision Support Systems
Title
MODSIM vs STATEMOD - Recommendation for CRDSS Water Resource Planning Model
Description
Colorado River Basin - Colorado River Computer Models-Colorado River Decision Support System
Decision Support - Doc Type
Report
Date
2/16/1995
DSS Category
Surface Water
DSS
All
Basin
Statewide
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />000050 <br /> <br />RECOMMENDATION FOR <br />CRDSS WATER RESOURCE PLANNING MODEL <br />ST A TEMOD VS. MODSIM <br /> <br />Prepared by Ross Bethel <br />Febmary 16, 1995 <br /> <br />BACKGROUND <br /> <br />During a four month discovery and evaluation phase in early 1994, seven river basin simulation <br />models were evaluated by the CRDSS consulting team for their ability to meet the goals and <br />objectives of the CRDSS water resource planning model (WRPM), Two levels of evaluation <br />criteria were established. The first level included model availability, status of documentation, <br />and fundamental functionality, A second level of criteria focused on technical functionality, user <br />compatibility, performance, and flexibility for the water resource planning issues contemplated <br />for CRDSS, <br /> <br />In May, 1994, the consultant team "concluded that the model MODSIM best meets the overall <br />CRDSS objectives." The Department of Natural Resources CRDSS management team (DNR <br />team) subsequently adopted the consultant team recommendation that MODS 1M be used as the <br />foundation for the CRDSS water resource planning models. <br /> <br />During the last nine months, the consultant team has been developing the WRPM prototype for <br />the Gunnison River Basin using the MODS 1M model. This effort has consumed more time and <br />resources than expected. <br /> <br />Since July, 1994, the DNR team has expressed a number of concerns to the consulting team <br />about the usability, functionality, performance and completeness of the early prototypes, In mid- <br />October an early release of the Gunnison Basin prototype was made available to the state, <br />Following review of the October prototype, the state decided it needed a tool to confirm proper <br />operation of the complicated modeling environment of the prototype, A secondary purpose was <br />to provide an optional modeling environment in the event that the MODS 1M implementation was <br />not successful. An effort was initiated by the DNR team to adapt the data developed for the <br />Gunnison Basin prototype to another model. The alternative model selected was the version of <br />the BESTSM model developed and applied hy Boyle Engineering in the state study of the Green <br />Mountain Pumpback Project in the late 1980's. This BESTSM model was a runner-up to <br />MODS 1M in the May, 1994 model recommendations. Ray Bennett of the Division of Water <br />Resources was given primary responsibility of implementing a version of the Gunnison River <br />Basin prototype using the BESTSM model. <br /> <br />FIRST YEAR WRPM WORK PRODUCT <br /> <br />At the formal conclusion of the first year of development on January 10, the consultant team <br />
The URL can be used to link to this page
Your browser does not support the video tag.