Laserfiche WebLink
<br />001601 <br /> <br />11 <br /> <br />::,,(:>\(};:;?,;,{ ,'.,'. ,: \ <br />it.,;':;":?:;.;: :i' <br />:;:::;:</;;.".')i...':. <br />.~>:.~;':{,',;;;?t'.':\.,'.:.::,!..:;:. <br />i.:;~"<>' {.8 .:, ..,;;;:,:.~/:,;;:.:; <br />,;.;', ; -';;"""";')"..>.::'; <br />:;;:)\:,'...',... :":';{.}:";:' <br />i:f.H.,'.r;; ;;:,.,. <br />i:';:: ,'/:;.(.}',),:';:A::. <br />,,":" {(:":,.,:,<'\ :', <br />>}:,:.,,:',.;:. :V' ;...,;. \.;: ,';: <br />::-; ';'j:;",:+::;,: ;,.,} :; <br /> <br />;?~:~.~::::+(': ,,'" ;- 5; <br />;,/,.ri) :,;,': <br />:";) \. ::::;:F'::I,/i'::{;,: ;,;; <br />;'~:;'';: '/.i;,.:::i ;:', <br /> <br />:.::.;:;:.::' :.):,:;,.,,,,, :::. <br />" (': <br />:.; ::',:/".,}:;':. >, ;..: <br />. \,:'\. ';x:.'.::' ';2', ::;, <br />';'",,>,," ; <br /> <br />:~;{\.:>,>)<'~};,:;:'T <br />:,' );,"t:.\";' ',',,{,. <br />',:.,'/.,"'{.,c;':." ;,,; <br />;'''::";,/,};;,':'Y,,i.':. ':: <br />:::;'<~;.~/.;,;;;; ;)\;./:' " <br />;;;>:?r:.,;.. :.:; '. <br />c;;;".':.;",....,: :.} ,'" !i <br />,',;", /<,;'.i~: <br />.': ::"::~,,;/;;,;..:F: ".,'.::;;;.:t: <br />1:,:'(f;;~:"",\ ;.:i.:; ',i <br />"r >; 5:'(:>:': .\;:,::: <br />,,:",y.::.:,,',,;:i:,>,' <br /> <br />i,:,:i1~:~;~;;;~~i';';':;{i;:; ~'j <br /> <br />; ,,,.f'.' <br />':;'i", .;:.,,' t:,;', <br />:;,., "ii; ;\"(;""::;~{ <br />',' ',:X":':" "!)":,.;-:, <br /> <br />5o,1.;),t, .. i';':";:;;:;:,;) <br />;; ":t;;:;,,~'.E:;J:t:::~;'~{':?':;:~:;'5:'~~, <br />",','<': :;:;'<";' <br />:"":/'?"';",;':':h ;.iii,.:;: <br />::("),;.; ",::;~,:, <br />';;"';/"::::';;'.;}'::.f,;::htr:;.,,! <br />/.'>:i:.?j..."',,...;,;,;,3 <br />::,~,;,:. ,;,";':L::' <br />,,;";.(itt .,":::,o:,}:;,':;,,!';,;..' <br />;::.:iY""'" ',,: :' <br />i'':'" :'(}i'i':':;;' ;::;: <br /> <br />::"":'.:>;,f::::,.;,/'; '::,: f;i~; <br />..,':.{i"'.;',;-;:::.:::.:;?,%,,;',..i:; <br /> <br />.\.,., ':; <br />."O;;':'j'''' N <br />:":,"}"";':, .;' ,"~, <br /> <br />(;-"::;!:::~;;:'r;;f,\;St:ljj; ;." <br /> <br />crement's pro rata share of the allocable annual operation, mainte- <br />nance, and replacement cost. <br />Subsection (b), paragraph (1), provides that the Secretary shall ' <br />defer, without interest, the repayment of construction costs within <br />the capability of the land to repay which are allocable to each <br />tribe's agricultural water allocation from the two projects as pro- <br />vided in the Leavitt Act (25 U.S.C. 368a)and the Colorado River <br />Storage Project Act. Such costs beyond the capability of the land to <br />repay are to be repaid as provided in subsection (g). It further pro- <br />vides that the tribe's share of the operation, maintenance, and re- <br />placement costs allocable to its agricultural allocation shall be born <br />by the Secretary, without reimbursement by the tribe, until the <br />tribe first uses water, either directly or under a water lease con- <br />tract. <br />Paragraph (2) provides that, as an increment of water is first <br />used by the tribe, it shall begin bearing the increment's pro rata <br />share of the allocable annual operation, maintenance, and replace- <br />ment costs. It further provides that, any time such water is, used by <br />a tribal lessee on non-Indian land, the tribe shall bear that incre- <br />ment's pro rata share of agricultural irrigation construction costs <br />within the capability of the land to pay as established in subsection <br />(b)(l). <br />Subsection (c), paragraph (1), provides that the Secretary shall <br />bear any increased annual operation, maintenance, and replace- <br />ment costs to the Animas-La Plata water users made necessary by <br />the decision of either tribe not to take its project water from the <br />Ridges Basin Pumping Plant pursuant to the Agreement until the <br />water is first used by the tribe, either directly or pursuant to a <br />water use contract. Such cost is not to be reimbursable by the <br />tribe. <br />Paragraph (2) provides that, as an increment of such water is <br />first used by the tribe, the tribe shall begin bearing that incre- <br />ment's pro rata share of the annual operation, maintenance, and <br />replacement costs, if any. <br />Subsection (d) provides that the Secretary may defer all or a part <br />of the tribal construction obligation and bear all or a part of the <br />tribal operation, maintenance, and replacement obligation if the <br />tribe can demonstrate that, it cannot meet those obligations either <br />out of gross revenues from water use contracts for use of water <br />from either the Animas-La Plata Project or the Dolores Project or <br />from the tribe's own use of the water. <br />Subsection (e) provides that, for the purpose of this section, water <br />use shall be deemed to occur in any water year in which the tribe <br />actually uses the water or during the term of a water use contract. <br />A water use pursuant to a contract under which the tribe only re- <br />ceives income in the nature of a standby charge is deemed not to <br />be a water use. <br />Subsection (0 authorizes to be appropriated such sums as are <br />necessary for the Secretary to pay the annual operation, mainte- <br />nance, and replacement costs as provided in this section. <br />Subsection (g) provides that that portion of the costs of the <br />Animas-La Plata Project in excess of the ability of the water users <br />to pay shall be repaid from the Upper Colorado River Basin Fun~ <br />