My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC07012
CWCB
>
Water Supply Protection
>
Backfile
>
19000-19999
>
WSPC07012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:08:52 PM
Creation date
10/9/2006 6:13:34 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
7630.650
Description
Wild and Scenic - Yampa River
State
CO
Basin
Statewide
Date
9/15/1976
Title
Revised Work Plan - Yampa-Green Wild and Scenic Rivers Study
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />001719 <br /> <br />M.B.a. WORK PLAN <br />continued <br /> <br />EMPLOYEE <br /> <br />Harold J. Belisle <br /> <br /> <br />L8. <br /> <br />TASKS REQUIRED TO ACCOMPLISH OBJECTlV E _,v~ <br />!-_ tt;' <br />It \~- 0- <br />;,J,^~;!"; ,.,II~.v .'>~"f'"" . <br />.' D' ."~'" t. <br />...!. f _~. <br />Prepared data for "NED, EQ, SWB, and <br />RP Accounts" for draft report (Chapter 5). <br />~(,,,,Vl1,l !lH. <br />Evaluated the effects of the alternative <br />plans on the four accounts, including <br />tabular display of impacts of plans <br />(Chapter 5) and revised draft river <br />analysis and classification of segments <br />(Chapter 4) as needed for the draft report <br /> <br />L9. <br /> <br />" <br /> <br />OBJECTIVE 1.0. NUMBER 3-RPS-82 <br /> <br />INDIVIDUAL TASKS <br />COMPLETION DATES <br />& COSTS <br />PLANNED ACTUAL <br /> <br />2/1/77 <br /> <br />2/15/77 <br /> <br />20. Completed summary tables and all narra- 3/1/77 <br />tive for "Analysis of Alternatives" <br />section of draft report (Chapter 5). <br />Initiated Study Team review of this sectiof" <br /> <br />4/1/77 <br /> <br />21. Reached agreement between BOR, UDNR, <br />CDNR, NPS, and FWS, BLM, USFS, on <br />recommended plan (Regional Director's <br />meeting if needed). <br /> <br />22. Completed analysis of actions tentatively 5/1/77 <br />selected and briefed Director on findings. <br />(BOR Manual 800.2.9). <br /> <br />23. Completed all graphics for draft study <br />report. <br /> <br />6/15/77 <br /> <br />24. Completed "Introduction" (Chapter I) and 7/15/77 <br />"Conclusions and Recommendations" <br />(Chapter 6) sections of the draft report. <br />Initiated Study Team review. <br /> <br />25. Completed revisions to all sections of ~0/15/77 <br />draft study report (from Study Team re- <br />view), prepared complete draft report and <br />initiated final in-house review (Study <br />Team review concurrent with 30-day MCRO <br />review). " <br /> <br />7 <br />I <br /> <br />PROGRESS REV IEW <br /> <br />Pr09rlSS and/or problems r.lat.d to <br />indj"jdual ,erformonu or conditions. <br />Chronology 01 resulh .corrective odio"~. <br />recycling, .'e. <br /> <br />, <br />
The URL can be used to link to this page
Your browser does not support the video tag.