My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC06979
CWCB
>
Water Supply Protection
>
Backfile
>
19000-19999
>
WSPC06979
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:08:42 PM
Creation date
10/9/2006 6:12:33 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8064.100
Description
Ute Tribes
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
6/1/1987
Author
CO Dept of Law
Title
Agricultural Engineering Study - Piedra Watershed - Final Report - Design-Cost Estimate for Off-Farm Irrigation Facilities and PIA Determination
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />'-..} <br /> <br />1250 <br /> <br />Off-farm irrigation transmission facilities <br />designed for those parcels with preliminary <br />greater than the off-farm water pumping costs. <br />re-evaluated, added to the facilities cost, <br />preliminary payment capacity. <br /> <br />were conceptually <br /> <br />payment capacities <br />The pumping cost was <br />and compared to the <br /> <br />To complete the PIA analysis, the cropping pattern and payment <br />capacities were reviewed by the economist taking into account the <br />practicality of the cropping pattern for the particular parcel and <br />any agronomic costs that might be particular to the parcel. Several <br />iterations of this process between the economist and the engineer <br /> <br />were sometimes necessary in order to develop the most economical <br /> <br /> <br />parcel and facilities layout. Those parcels that still exhibited <br /> <br /> <br />positive residual payment capacity after these further analyses were <br /> <br /> <br />then determined to be practicably irrigable. <br /> <br />0.2 SELECTION OF PARCELS FOR OFF-FARM DESIGN <br /> <br /> <br />Parcels to be considered for PIA analysis were identified in the Task <br /> <br /> <br />B Report along with on-farm irrigation costs. The Task B report <br /> <br /> <br />identified irrigation costs for handmove sprinkler, sideroll <br /> <br /> <br />sprinklet:, gravity (furrow or basin), center pivot, and center pivot <br /> <br /> <br />with sprinkler in the corners. Computer tabulation compared on- <br /> <br /> <br />farm irrigation costs to the crop payment capacity for an <br /> <br /> <br />alfalfa/barley crop rotation. <br /> <br />The fit:st step in making this task analysis was detet:mination of the <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.