Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />1268 <br /> <br />APPENDIX 0.1 <br />LEG END <br /> <br />Parcel 1.0.: Sll-P-Ol, "Sll" = Southern Ute Sheet 11; "p" = piedra <br />Watershed; "01" = parcel number. <br /> <br />Field Size: <br /> <br />Gross size of parcel in acres. <br /> <br />Reduction Factor: <br />Report. <br /> <br />Acreage reduction factor discussed in Task A <br /> <br />Net Acreage: <br /> <br />The product of field size times reduction factor. <br /> <br />Elevation High and Low: The maximum and minimum elevation within <br />the parcel. <br /> <br />Climatic Zone: Discussed in Task A Report and determined by the <br />parcel's elevation. <br /> <br />Irrigation System Type: Type of on-farm irrigation system. <br />HNDMVE - Handmove sprinkler <br />SDROLL - Side roll sprinkler <br />GRAV Gravity <br />CNTRPVT- Center pivot sprinkler <br />CPVT/HMV- Center pivot with handmove <br /> <br />Net Feet: The unit net average irrigation water requirement for the <br />parcel in acre-feet per acre. <br /> <br />Irrigation Efficiency: <br />Report. <br /> <br />Irrigation efficiency discussed in Task A <br /> <br />Applied: The <br />requirement in <br /> <br />unit gross <br />acre-feet per <br /> <br />on-farm <br />acre. <br /> <br />irrigation <br /> <br />water <br /> <br />average <br /> <br />Preliminary Net Ag Return: The preliminary net <br />return not including the on-farm irrigation system <br />irrigation water transmission/distribution system. <br /> <br />agricultural <br />or off-farm <br /> <br />Capital: The amortized capital cost per acre per year for the on- <br />farm irrigation system (at 8 3/8% for 50 years) from Task B Report. <br /> <br />Maintenance: The per acre per year maintenance cost of the on-farm <br />irrigation system from the Task B Report. <br /> <br />Labor: The per acre' per year labor cost for operation of the on-farm <br />irrigation system from the Task B Report. <br /> <br />pumping: The per acre per year cost of providing additional on-farm <br />pumping to meet the higher pressure requirements of the center pivot <br />irrigation system. <br />