My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC06979
CWCB
>
Water Supply Protection
>
Backfile
>
19000-19999
>
WSPC06979
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:08:42 PM
Creation date
10/9/2006 6:12:33 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8064.100
Description
Ute Tribes
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
6/1/1987
Author
CO Dept of Law
Title
Agricultural Engineering Study - Piedra Watershed - Final Report - Design-Cost Estimate for Off-Farm Irrigation Facilities and PIA Determination
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I ' " 1261 <br /> PIEDRA WATERSHED <br />I TABLE D .'4 <br /> SUMMARY OF OFF-FARM IRRIGATION WATER COST <br />I y y Water Residual <br />I Parcel Gross Net Pay.Cap. Cost Pay.Cap. <br />No. Acres Acres $/ac/yr $/ac/yr $/ac/yr <br /> POOl 26 26 163 450 -287 <br />I P002 7 7 112 1241 -1129 <br />P003 33 33 167 172 -5 <br /> P004 24 24 164 218 -54 <br />I P005 29 29 165 150 151/ <br />P006 14 14 147 189 -423/ <br />P007 103 101.9 169 107 6z..:: <br />I P008 6 6 105 370 -2653/ <br />P009 74 73.2 170 153 17- <br />POlO 9 9 126 435 -309 <br /> POll 9 9 126 237 -111 <br />I P012 17 17 154 1258 -1104 <br />P017 23 23 137 1019 -882 <br /> P018 35 35 141 889 -748 <br />I P020 13 13 118 882 -764 <br />P021 11 11 113 882 -769 <br />P023 115 113.8 142 564 -422 <br /> P024 14 14 120 795 -675 <br />I P025 65 64.3 144 791 -647 <br />P026 48 47.5 144 768 -624 <br /> P028 58 57.4 170 545 -375 <br />I P029 37 37 142 550 -408 <br />P030 43 42.5 171 490 -319 <br />P032 6 6 131 326 -195 <br />I <br /> y Net acres for parcel, irrigation system, combination <br />I resulting in the highest payment capacity. See Appendix D.l. <br /> '!:./ Highest preliminary payment capacity from Appendix D.l. <br />I 1/ Parcel with positive residual payment capacity. <br />I <br />I <br />I <br />I 13 <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.