My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC06979
CWCB
>
Water Supply Protection
>
Backfile
>
19000-19999
>
WSPC06979
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:08:42 PM
Creation date
10/9/2006 6:12:33 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8064.100
Description
Ute Tribes
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
6/1/1987
Author
CO Dept of Law
Title
Agricultural Engineering Study - Piedra Watershed - Final Report - Design-Cost Estimate for Off-Farm Irrigation Facilities and PIA Determination
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1'2.56 <br /> <br />of 1985. <br />provided. <br /> <br />A detailed discussion of the power costs was previously <br /> <br />D.3.6 Other Costs Not Included <br />Other known costs which could be considered are costs for access <br />roads to the pump stations, right-of-way costs where pipelines or <br />pump stations may be on non-Indian land, and costs to provide <br /> <br />electric power service to the pump station. These costs are either <br /> <br /> <br />minor and/or difficult to estimate with available information. <br /> <br /> <br />Therefore, for these preliminary analyses, they have not been <br /> <br /> <br />considered at this time. <br /> <br />The cost of power line extensions to serve pumping facilities could <br /> <br /> <br />be quite high, especially if three phase power is required. Three <br /> <br /> <br />phase power will be required for pump stations over 25 horsepower. <br /> <br />D.4 PRELIMINARY PRACTICABLE IRRIGABLE ACREAGE <br /> <br /> <br />D.4.1 Existing Irrigated Lands <br /> <br /> <br />Lands currently irrigated are assumed to be PIA requiring no further <br /> <br /> <br />evaluation. No currently irrigated acreage was found in the Piedra <br /> <br /> <br />watershed. <br /> <br />D.4.2 Water Supply <br /> <br /> <br />An examination of the hydrology data for the Piedra River shows that <br /> <br /> <br />there is sufficient virgin flow during the summer irrigation periods <br /> <br /> <br />to serve the potential arable lands directly from the river. <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.