|
<br />OCr1833
<br />
<br />distributed using percentages based on the mean monthly present
<br />modified flows for the 1941-1970 period as shown in Table XV. Under
<br />certain conditions, the operating criteria may~allow the target values
<br />to be exceeded due to reservoir spills. These excesses are tabulated
<br />for each run in Table XIII.
<br />
<br />All other inputs are treated as import/exports in which both the
<br />mass of salts and water are specified. The letters in Table IX refer
<br />to numeric values tabulated in Tables X and XI, These projects,
<br />described briefly in the Biennial Report[l, Part VII, pp 41-54]
<br />include:
<br />
<br />Projects above the Green River at Green River, Utah, which are
<br />input to Element 5, Figure 2, and include Seedskadee, Lyman,
<br />Utah Power and Light, Bonneville Unit, Upalco Unit, Uintah
<br />Unit, Four County, Hayden Steamplant, Cheyenne-Laramie, Savery-
<br />Pot Hook, and the Jensen Unit.
<br />
<br />"
<br />r'
<br />I'
<br />
<br />Projects above the Colorado River at Cisco, Utah, which are
<br />input to Element 7, Figure 2, and include Denver-Englewood,
<br />Green Mountain, Homestake, Fryingpan-Arkansas, Ruedi M. and I.,
<br />West Divide, Fruitland Mesa, Bostwick Park, Dallas Creek, Dolores,
<br />and SanMiguel.
<br />
<br />I
<br />"
<br />
<br />Projects above the San Juan River near Bluff, Utah, which are
<br />input to Element 8, Figure 2, and include San Juan-Chama, Navajo
<br />Indian Irrigation, Animas-La Plata, Expansion Hogback, Four
<br />Corners Powerplant, and return flows from the Dolores and Navajo
<br />Indian projects.
<br />
<br />The single project above the San Rafael River near Green River,
<br />Utah, which is input to Element 6, Figure 2, and is the U.P.
<br />and L. steam-electric plants in Emery County.
<br />
<br />~
<br />
<br />, :~
<br />
<br />",i' .
<br />
<br />if
<br />
<br />Projects drawing water from the Lake Powell reach, Element 10 of
<br />Figure 2, including Resources Incorporated, Arizona M. and I.,
<br />and water salvage projects.
<br />
<br />Projects drawing water from the Lake Mead reach, Element 13 of
<br />Figure 2, including the Dixie Project and Lake Mead M. and I.
<br />(which includes the Southern Nevada Water Project).
<br />
<br />r
<br />
<br />Projects drawing water from Lake Havasu, Element 15 of Figure 2,
<br />but are located in Element 19 as previously noted, inCluding MWD
<br />and CAP.
<br />
<br />28
<br />
|