My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC06838
CWCB
>
Water Supply Protection
>
Backfile
>
19000-19999
>
WSPC06838
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 9:40:17 PM
Creation date
10/9/2006 6:06:18 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Basin-Colorado River Computer Models-Colorado River Decision Support System-Ray
State
CO
Water Division
5
Date
3/28/1994
Author
Darrell Fontane
Title
AOP-Suggested Work Plan for Task 1.13a Annual Operating Plan Model-
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />"or" ,'., ~" <br />. rr.n,;.jJarrp,1l G. rl\-r.~ Tn: l.Bny l\nl7il <br />,..' <br /> <br />Olltw;3}31fl1-C rimll: 11:03:.(5 <br /> <br />I'IIDIl3P1.. <br /> <br />00121U <br /> <br />SUGGESTED WORK PLAN FOR TASK 1.13(a) ANNUAL OPERATING PLAN MODEL <br />(Prepared by Darrell Fon!>",e) <br /> <br />I\,farch 28, 1994 <br /> <br />Su btask 1 <br /> <br />A. During Pbase T, review tne capabilities ofthe AOP model on the SUN workstation <br />and the AOP spreadsheet model and assess the requirements to incorporate either <br />ofthese models in the CRDSS. <br /> <br />(I) <br />(2) <br />(3) <br /> <br />Key Responsibility: <br />Start Date: <br />Completion Date: <br /> <br />Fontane (lead), Brazil <br />March 28 <br />May 1 <br /> <br />Subtask I-A <br /> <br />A Working through the Project Manager, acquire a copies of the AOP models. <br />Dctennil1e if a site license exists at Colorado State University to run the GKS graphics ol1the <br />SlJN workstation ....ersion. <br />(1) Key Responsibility: <br />(2) Start Date: <br />(3) Completion Date: <br /> <br />Fontane (lead), 1...1a]ers <br />March 28 <br />April 6 <br /> <br />Subtask I-B <br /> <br />B. Meet with Terry Fulp to review the graphical display system developed using the <br />GKS system. Discuss the amount of effort that would required to develop an <br />equivalent graphical user interface (GUI) for the AOP model as part of the CRDSS, <br />assuming that acquiril1g a GKS lioense is not desirable. <br />(1) Key Responsibility: Fontane (lead), MaIers <br />(2) Start Dale: March 28 <br />(3) Completion Dale: Apri16 <br /> <br />Subtask l-C <br /> <br />Develop a preliminary design for the AOP GUI and an initial estimate of effort <br />required to develop the GUI for the CRDSS. Discuss the design and effort <br />required with the State project management team. <br />(1) Key Responsibility: <br />(2) Start Dale: <br />(3) Completion Date: <br /> <br />C. <br /> <br />Fontane (lead), MaIers, Brazil <br />April 13 <br />April 22 <br /> <br />Subtask 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.