Laserfiche WebLink
<br />" <br />- <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />>I< RANKING OF THE 75 LARGEST 602(A) REQUIRED STORAGE VALUES *' <br /> <br />--.---------------..-----------------.----------------------------------.---------------.-.--.-.------------------~::}.~--~~---- <br />CASE 1: 5,8 DEPLETIONS. 6,12% DEPLETION SHORTAGE, SEDIMENT LOAD, NO BANK STORAGE, POWER POOL NOT CONSIDERED <br /> <br />------------------------------------------------------------------------------------------------------------------------------------ <br /> <br />o <br />= <br />1'.' <br />00 <br />C.T1 <br />..... <br /> <br />INFLOW: THE AVERAGE NATURAL RUNOFF AT LEES FERRY, FOR THE SPECIFIC PERIOD (SEE TABLE) <br />DEPLETIONS: EITHER 5.8 MAF OR THE USSR PROJECTED DEPLETIONS AVERAGED FROM 1985 TO THE END OF THE SPECIFIC PERIOD (SEE TABLE) <br />ALLOWABLE DEPLETION SHORTAGE = 6.12 PERCENT MINIMUM ANNUAL RELEASE FROM LAKE POWELL = 8.23 MAF <br />INITIAL SEDIMENT ACCUMULATION (1985) = 1.342 MAF BANK STORAGE COEFFICIENT .00 <br />ANNUAL SEDIMENT LOAD = 61000.0 ACRE-FEET A MINIMUM POWER POOL OF .000 MAF IS MAINTAINED IN THE UPPER BASIN RESERVOIRS <br /> <br />REQUIRED STORAGE = (AVERAGE DEPLETION - AVERAGE INFLOW + MINIMUM RELEASE + ANNUAL SEDIMENT LOAD) X LENGTH OF PERIOD <br />+ INITIAL SEDIMENT ACCUMULATION + VOLUME NEEDED TO MAINTAIN MINIMUM POWER POOL <br />REQUIRED STORAGE IS COMPUTED FOR ALL HISTORICAL SEQUENTIAL RUNOFF PERIODS OF ALL LENGTHS (1906-1983 HYDROLOGIC RECORD) <br /> . <br /> LENGTH OF AVERAGE AVERAGE REQUIRED PROBABILITY <br /> PERIOD BEGINNING INFLOW DEPLETION STORAGE (PLOTTING <br /> RANKING (YEARS) OF PERIOD (MAF) (MAF) (MAF) POS IT I ON) <br /> - ------ --------- ---- -- - -- ------- --------- -------- - - - -- -- ---- <br /> 1 25 1953 12,97 5.80 20.46 99.97 <br /> 2 12 1953 12.18 5,80 19.96 99.94 <br /> 3 26 1953 13.04 5.80 19.55 99.90 <br /> 4 29 1953 13.12 5,80 19.16 99.87 <br /> 5 16 1953 12.63 5.80 19.10 99,84 <br /> 6 15 1953 12.57 5.80 18.87 99.B1 <br /> 7 17 1953 12.76 5,80 17.98 99.77 <br /> 8 24 1954 13,04 5,SO 17.93 99.74 <br /> 9 11 1954 12.27 5.80 17.43 99.71 <br /> 10 11 1953 12,31 5,80 17,02 99.68 <br /> 11 25 1954 13.11 5.80 17.02 99.64 <br /> 12 14 1953 12,62 5.80 16.94 99.61 <br /> 13 30 1953 13.22 5.80 16,79 99.58 <br /> 14 28 1954 13,19 5,80 16.63 99.55 <br /> 15 9 1953 12.04 5.80 16.58 99.51 <br /> 16 15 1954 12.72 5.80 16.57 99.48 . <br /> 17 18 1953 12.90 5.80 16.38 99.45 <br /> 18 14 1954 12.66 5.80 16.34 99.42 <br /> 19 20 1953 12.99 5.80 16.34 99.38 <br /> 20 27 1953 13.19 5.80 15.99 99.35 <br /> 21 19 1959 12.97 5.80 15.98 99.32 <br /> 22 6 1959 11,38 5.80 15.47 99.29 <br /> 23 16 1954 12.85 5.80 15.45 99.25 <br /> 24 4 1953 10,22 5.80 15.41 99.22 <br /> 25 20 1959 13.05 5.80 15.07 99.19 <br /> 26 28 1950 13.25 5,80 14.97 99,16 <br /> 27 19 1953 13.02 5.80 14.90 99.12 <br /> 28 13 1953 12.70 5,80 14.83 99.09 <br /> 29 23 1959 13.16 5.80 14.68 99.06 <br /> 30 10 1959 12.41 5.80 14.61 99.03 <br /> 31 27 1951 13.25 5.80 14.55 98.99 <br /> 32 10 1954 12.42 5,80 14.49 98.96 <br /> 33 15 1950 12.86 5.80 14.46 98.93 <br /> 34 13 1954 12.73 5,80 14.41 98.90 <br /> 35 9 1959 12.29 5.80 14.39 98.86 <br /> 36 29 1954 13.29 5.80 14.26 98.83 <br /> 37 29 1950 13,30 5,80 14.06 98,80 <br /> 38 8 1954 12.15 5.80 14,05 98.77 <br /> 39 14 1951 12.83 5.80 14,04 98.73 <br /> 40 17 1954 13.00 5.80 13.84 98.70 <br />