Laserfiche WebLink
<br /> <br />... e'" ~A_. . _ <br />" <br />~:;';"'-;-:::L.;..:;:...:.:.7....___:.;.._ :..._~. <br /> <br />~.,. <br />, <br /> <br />:::. _.:':;;'_~4. .:.~_.::.....~~.;~::..- '.:-~r :,.:::-::-: ~'",~ "k~~;;;.tf,;~:I~~:::~~"",;'::;;'~T1lf': <br />-, MOON LAKE PROJ~CT , <br />PRELIMINARY PLANNING FACT SHEET <br /> <br />O~~ER - OPERATOR <br /> <br />Deseret Generation & Transmission Cooperative <br />Sandy, Utah <br /> <br />. <br /> <br />BASE PLA.NT <br />1\10 Units: 400 NW (350 NW Net) <br />In-Service Date: Unit 1 - 1985, Unit 2 - 1998 <br />Cooling System: Closed Cycle Evaporative Cooling (Tovers) <br />Gas Cleaning System: Precipitator or Baghouse & l<et Limestone Scrubber <br />Base Operating Conditions: 2,600 pSig/l,OOOoF/I,OOOoF <br />Plant Loading: <br />Average ~~nual Capacity Factor: 65% <br />Availability: 77% <br />Running Capacity Factor: 85% <br />Plant Heat Rate: 11,050 Btu/k~~ (Average Annual Net) <br /> <br />*WATER REQUIRE}~NTS Acre-ft/yr (GPN) <br />Cooling Tower }lake-up: 6,860 <br />Scr~bber Make-up: 440 <br />Miscellaneous Plant Uses: 700 <br />Total: 8,000 <br />Potential Sources: White River, Green <br />Delivery: Via pipeline from source <br /> <br />*COAL USE (tons/yr at assumed plant loading) <br />Rangely Coal Field: 1,400,000 <br />Btu: 10,500 Ash: 11.0% Moisture: 11.07. Sulfur: 0.45% <br />Delivery: Truck, Captive Railroad, Slurry Pipeline, Conveyor <br />North Wasatch Plateau Coal Field: 1,200,000 <br />Btu: 12,200 Ash: 6.17. Moisture: 7.2% Sulfur: 0.67. <br />Delivery: Rail <br />Emery Coal Field: 1,300,000 <br />Btu: 11,424 Ash: 8.97. Moisture: 7.4% Sulfur: 0.997. <br />Delivery: Rail <br /> <br />(4,260) <br />( 270) <br />( 430) <br />(4,960) <br />River, Fremont <br /> <br />River, Ground~ater <br /> <br />. <br /> <br />*WASTE PRODUCTION (tons/yr at assumed plant loading) <br />Rangely Coal Field <br />Ash: <br />Scrubber Waste: <br />Total: <br />North Wasatch Plateau Coal Field <br />Ash: <br />Scrubber Waste: <br />Total: <br />Emery Coal Field <br />Ash: <br />Scrubber Waste: <br />Total: <br /> <br />153,000 <br />57,000 <br />210,000 <br /> <br />63,000 <br />59,000 <br />122,000 <br /> <br />98,000 <br />103,000 <br />201,000 <br /> <br />0318 <br /> <br />,-,' <br /> <br />*~:~~: Requirements, Coal use~:~~ Yaste ~tiOD <br /> <br />7- '\., <br />~ <br /> <br />calculated for one 400-MY <br /> <br />. <br />