Laserfiche WebLink
<br />0022'75 <br /> <br />II I, Sizing Study of Coal Creek Reservoir <br />A. Operation Study <br />The reservoir operation study will present the capability of the Coal Creek <br /> <br />Reservoir to operate under its transferred water rights when .demands and evapora- <br /> <br />tion requirements are superimposed upon the water supply avai lable, <br /> <br />B. Sedimentation Study <br /> <br />Sedimentation requirements wi fl be ascertained over a fifty year period, <br />C. Flood Study <br /> <br />The flood study ';Ii 1"1 present the design flood for the basin above the site, <br /> <br /> <br />These results will be compared with flood hydrology study currently being under- <br /> <br /> <br />taken by the U. 5, Soil Conservation Service, if same is available in a timely <br /> <br /> <br />manner during the duration of this study, <br /> <br /> <br />0, Spillway Requirements <br /> <br /> <br />A flood routing study wi 11 be completed based upon the above data, The re- <br /> <br /> <br />sults of this study will determine the size of the spillway required for the Coal <br /> <br /> <br />Creek Dam, <br />