Laserfiche WebLink
<br />002279 <br /> <br />VI. Study Costs <br /> <br />Man Hou rs PART <br /> <br />Cost <br /> <br />,.. Water Rights Review <br /> <br />N.C. <br /> <br />A. Identify Senior Ditches <br /> <br />N,C. <br /> <br />B. Quantify Water <br /> <br />N.C. <br /> <br />TOTAL PART I <br /> <br />N.C. <br /> <br /> PART II <br />40 II, Reservoir Operation Study $2640 ;1 <br /> \' <br /> III, Sizing Study of Coal Creek Reservoi r I <br /> A, Operation Study N.C, <br />24 B. Sedimentat ion Study 720 <br />24 C. Flood Study 720 <br />40 D, Spi llway Requirements $1200 <br /> TOTAL $2640 <br /> IV. R,aw Water Conveyance Facilities I <br /> A. South Boulder Diversion Canal <br />40 * ..I Capacity Analysis $1200 <br />160 ,~ .2 Management Plan 6400 <br />48 * .3 Requ ired Improvements 1440 <br /> TOTAL $9040 <br /> B, Community Dj tch I <br />40 * ,1 Capac i ty Ana l"ys i s $1200 <br />50 * Managemen t . Plan 1500 f <br /> .2 I <br /> t <br />24 t, .3 Requ ired Improvements 720 <br /> TOTAL $3420 <br /> <br />7 <br />