My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC06655
CWCB
>
Water Supply Protection
>
Backfile
>
19000-19999
>
WSPC06655
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:07:06 PM
Creation date
10/9/2006 6:00:27 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8541
Description
San Luis Valley Project
State
CO
Basin
Rio Grande
Water Division
3
Date
9/10/1969
Author
F Victor Schmidt
Title
San Luis Valley Project Closed Basin Drain - 1966-1969 - Memo: Closed Basin Division, San Luis Valley Project, Colorado - Bureau of Sport Fisheries and Wildlife Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />, <br /> <br />, O""jO'-:' I <br />. u.~., oJ u":t <br /> <br />. <br /> <br />. <br /> <br />12 <br /> <br />" <br />Other wildlife management practices would include census of bird <br />and animal populations, patrol and protection of the area against <br />fire, control of undesirable animals, trapping and banding programs, <br />and improving the upland-game habitat. Lands acquired for refuge <br />purposes will be of sufficient size that habitat for resident game <br />species would be improved incidentally to waterfowl management. <br /> <br />A refuge headquarters including public use and interpretation fa- <br />cilities would be provided. Boundary fences, posting, roads, trails, <br />and cattleguards would be needed to administer the area properly. <br /> <br />Development, operation, and maintenance costs would be assumed by <br />the project. Costs of land, relocation, and severance are esti- <br />mated to be $350,000. Development of refuge facilities are esti- <br />mated to be $1,358,000, resulting in a total cost of $1,708,000. <br />Operation and maintenance costs are estimated to be $62,000 annually. <br />These estimates, based upon 1969 costs, are shown in Table 4. <br />
The URL can be used to link to this page
Your browser does not support the video tag.