Laserfiche WebLink
<br />OO~211 <br /> <br />DISCUSSION AND INPUT <br /> <br />Agencies/Groups Represented <br /> <br />Federal <br /> <br />Bureau of Land Management (BLM) <br />Fish and Wildlife Service (FWS) <br />Federal Energy Regulatory Commission (FERC) <br />National Park Service (NPS) <br />U.S. Bureau of Reclamation (USBR) <br />Army Corps of Engineers <br /> <br />Non-federal <br /> <br />Colorado Division of Wildlife <br />Moffat County Commissioners <br />Upper Colorado River Commission <br />Don Hatch River Expeditions <br />Moffat County Planning Commission <br />Colorado Water Conservataon Board <br />Colorado Water Quality Control Commission <br />Great Northern <br />Juniper Water District <br />Craig Chamber 'of Commerce <br />Colorado River Fishes Recovery Team <br /> <br />f <br /> <br />I <br /> <br />Cross Mountain is being evaluated in the initial phase of the BLM <br />Wilderness Study. <br /> <br />I <br /> <br />" <br /> <br />BLM - Marv Pearson <br /> <br />The road shown in Juniper-Cross Mountain project maps across BLM <br />lands on the north side of the proposed Cross Mountain reservior - <br />why? No proposals to build road have been filed with BLM. <br /> <br />Bob Gervais <br /> <br />Referred to the Endangered Species Act as a "hurdle" to be overcome; <br />the job is to build the project within the constraints of the Act. <br />The sport fishing aspect of the proposed project has high appeal. <br />CRWCD consultants are an impressive group. <br />Must have operations study available in order to comment on <br />biological impacts. <br />Temperature effects should be addressed in the operating plan. <br />In response to Gervais' question, Fisher said CRWCD was responsible <br />for developing an initial environmental analysis in the form of <br />Exhibit W. FERC (lead agency) then develops a draft EIS using <br />Exhibit W, etc. <br /> <br />6 <br />