Laserfiche WebLink
<br />000504 <br /> <br />The town of Dolores will remain at the upper end of McPhee Reservoir and <br />growth of the town will be likely during and after construction of the <br />Dolores Project, Because of the reservoir, growth of the town will be in an <br />easterly direction. At present, the only other residential area along the <br />Right-of-Way boundary of McPhee Reservoir is a subdivision which lies in the <br />southeast corner of Section 7 snd the northeast corner of Section 18. <br /> <br />6 <br />