My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC06470
CWCB
>
Water Supply Protection
>
Backfile
>
17000-17999
>
WSPC06470
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:06:10 PM
Creation date
10/9/2006 5:54:18 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.100
Description
Colorado River Computer Models - Colorado River Simulation System - Reclamation - CORSIM
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1983
Author
DOI-BOR
Title
Colorado River Simulation System - CRSM Programmers Manual
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />NSMESS <br /> <br />NSNAP <br /> <br />NSYNCH <br /> <br />NTOT <br /> <br />NUMGEN <br /> <br />NUMNOD <br /> <br />NUMSEQ(I} <br /> <br />NUMTOT <br /> <br />NYR <br /> <br />NYRSOV <br /> <br />PDATA(I,J) <br /> <br />PKRINC <br /> <br />PKRPPR <br /> <br />OQ13J6 <br /> <br />The number of shortage messages generated <br />during the run. <br /> <br />The number of snapshot cards. <br /> <br />The number of "synch" errors. A synch error <br />occurs when the flow in the river computed in <br />HYDRBAL is more than 100 acre-ft different <br />than the flow in' the river computed in RSALT, <br />at some sequence point. <br /> <br />Total number of TAPEDIT parameters. <br />The total number of hydrology input stations. <br /> <br />Read from hydrology input file in INITIAL. <br /> <br />Total number of reaches. <br /> <br />Total number of sequence points in a reach. <br /> <br />I = Index of the reach. <br /> <br />Read from CONSEQ cards in READER. <br /> <br />The number of reaches at which a spring run- <br />off calculation is to be made and therefore <br />total inflows are required. <br /> <br />The number of years of data that has been <br />stored in the SUMRY and SUMRYT arrays. <br /> <br />The number of years in which the October 1 <br />contents of Lake Powell were overestimated at <br />least six out of the seven prediction months. <br /> <br />The target power demand at a powerplant. <br />(gWh) <br /> <br />I = Index of the reach containing the <br />powerplant. <br />J = Month number. (J=l,12) <br /> <br />Read from EQUpOW and TRNPDA cards in READER. <br /> <br />The amount of shortage or surplus to the <br />Mexican demand during the month. A neoative <br />value designates a surplus. (acre-ft) <br /> <br />Maximum average monthly Parker powerplant re- <br />lease. (acre-ft) <br /> <br />Read from SURPTWO card in INITIAL. <br /> <br />32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.