Laserfiche WebLink
<br />00'1'293 <br /> <br />ELMIN <br /> <br />ENERGY (I,J) <br /> <br />EOMC(I) <br /> <br />FORCMAX(I) <br /> <br />K = 1 to 12 Diversion for months 1 to 12. <br /> (acre-ft) <br />K = 13 Assigned a value in READER, but not <br /> used. <br />R = 14 Demand processing code. <br /> 1 - Process the demand <br /> 2 - (Not used) <br /> 3 - A schedule, do not process <br /> 4 - (Not used) <br />K = 15 Demand type <br /> 1 - Diversion with no return flow <br /> 2 - Scheduled diversion (CAP or MWD) <br /> 3 - Diversion with return flow <br />K = 16 Actual diversion for the month. <br /> (acre-ft) <br /> <br />K=l to 12, 14, and 15 are read from DEMSUR <br />cards in READER. <br /> <br />Water surface elevation of Lake Mead at which <br />the second level of shortages are imposed. <br />(feet) <br /> <br />Read from SHORTAGE card in INITIAL. <br /> <br />Coefficients for two third-degree polynomial <br />equations wh:lch relate to generator op- <br />eration. <br /> <br />I = Index of the reach where the powerplant <br /> is locate 1. <br />J = 1 to 4 Coefficients in the discharge <br /> eqilation. <br />J = 5 to 8 Coefficients in the horsepower <br /> equation. <br /> <br />Read from EQUEFF and Tr-NENE cards in READER. <br /> <br />Previous month's contents of the reservoirs. <br />(acre-ft) <br /> <br />I = Index of the reach where the reservoir is <br />located. <br /> <br />The quantity of runoff to be added to the <br />current forecast (the total inflow predicted <br />from the current month through July) to ob- <br />tain the maximum forecast (the estimated in- <br />flow volume that, on the average, will not be <br />exceeded 19 times out of 20). (acre-ft) <br /> <br />I = Month number, January through July. <br />(1=1,7) <br /> <br />19 <br />