My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC06402
CWCB
>
Water Supply Protection
>
Backfile
>
17000-17999
>
WSPC06402
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:05:50 PM
Creation date
10/9/2006 5:50:28 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8541
Description
San Luis Valley Project
State
CO
Basin
Rio Grande
Water Division
3
Date
1/5/1944
Author
Robert C Brown
Title
San Luis Valley Project Closed Basin Division - 1944-1946 - San Luis Valley Project, Colorado, Monthly Report for December, 1944
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />, 00,17 35 <br />vancy Ao1; in <br /> <br />. , <br />\ . , <br />(A) ...jseoure legislative amendmen1; 01 ,,~he <br />regard to appointment of direotor~. <br /> <br />Colorado Conser- <br /> <br />., <br />I <br /> <br />(B) ro cover other points in question in the oon'braot be- <br />tween the Distriot and the United States. <br /> <br />/" <br /> <br />(C) ro seek exemption from the 160 aore limitation of the <br />exoess lands provision of the Reolamation Law. <br /> <br />Cooperation. <br /> <br />Mr. Carrey Bennett from the Regional Office, Fish and Wildlife Service, <br />Albuquerque, and Mr. C. E. Hagie from the Colorado StateGama and Fish Depart- <br />ment, Denver, spent Deoember 6 and 7, in Monte Vista, disoussing, with Reclama- <br />tion Engineer,fish.values and improvement of fishing on the Conejos and Rio <br />Grnade through stream regulation, maintenanoe of oonservation pools and <br />oonstruotion of fish ladders and soreens. <br /> <br />. <br /> <br />Organization and Personnel. <br /> <br />Employe.. during Deoember averaged 25, of whioh 8 were engaged on <br />diamond drilling, 7 on topographio surveys, :3 in the Projeat Office, and 7 <br />on test-pits. . <br /> <br />. Weather. <br /> <br />The weather was generally clear and cold in the valley 1I1th number of <br />stormy days in the mountains. Snow at the Elk Creek Dam site measures <br />approximately 24 inches. <br /> <br />I <br />Ii <br />, <br /> <br />Plans for Coming Month. <br /> <br />Exploration by diamond drill 11111 continue at the Elk Creek site and <br />drilling, of 2 holes to complete the drill program at Wagon Wheel Gap Dam <br />site will be s1:arted. Sampling of possible embankment material at W!lgon <br />Wheel Gap, by test pits, is planned. <br /> <br />~ <br /> <br />~Ctg14z~ <br /> <br />'Engineer. <br /> <br />Copies <br /> <br />tor Mr. Clifford Stone, Direotor, Colorado Water Conservation Board, <br />Mr. M. C. Hinderlid!r, Coloradc State Engineer, <br />Regional Direotor, Region 5. <br /> <br />~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.