My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC06357
CWCB
>
Water Supply Protection
>
Backfile
>
17000-17999
>
WSPC06357
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:05:36 PM
Creation date
10/9/2006 5:48:48 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106.A.1.b
Description
Colorado River Water Projects - Animas La Plata - Project Description - Construction - PCC
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
8/9/2005
Author
John M Cyganiewicz
Title
Accountability Report to the Consultant Review Board Report - CRB Meeting Number 6 - RE-Ridges Basin Dam - Animas La Plata Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />"'1'. <br /> <br />, <br /> <br />0019H <br /> <br />Consultants Review Board <br />Ridges Basin Dam <br />James W. Erwin <br />David E. Kleiner <br />Edwin C. Rossilion <br /> <br />June 3, 2005 <br /> <br />Mr. JohnM. Cyganiewicz <br />Technical Services Center <br />Bureau of Reclamation <br />PO Box 25007, D-8311 <br />Denver, CO 80225 <br /> <br />FINAL <br /> <br />Subject: <br /> <br />Sixth Consultants Review Board Meeting <br /> <br />Dear Mr. Cyganiewicz: <br /> <br />In accordance with our individual contracts, the undersigned members of the Consultants <br />. Review Board (CRE) met to review the documents provided in your letter of May 6, <br />2005, to discuss the current status of conslructjon, to inspect the work performed to date, <br />and to respond tei specific questions posed to the CRE by Reclamation. <br /> <br />INTRODUCTION <br /> <br />The sixth CRE meeting was held May 16-20,2005 at the offices of the ALP Construction <br />Office in Durango. The meeting agenda and attendance list are attached to this letter <br />report. <br /> <br />The following are the CRE responses to a series of questions posed by Reclamation staff. <br />Additional comments concerning the various documents provided for our review are also <br />included in this report. These documents include the following: <br /> <br />. Accountability report for CRE meeting No.5, <br />· Amendments No.5 and 6 to the specifications for Contract No. 04-NA-40-8064, <br />Ridges Basin Dam Completion, <br />· . "Ridges Basin Dam Construction Geology Update" dated April 2005. <br /> <br />-1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.