My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC06357
CWCB
>
Water Supply Protection
>
Backfile
>
17000-17999
>
WSPC06357
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:05:36 PM
Creation date
10/9/2006 5:48:48 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106.A.1.b
Description
Colorado River Water Projects - Animas La Plata - Project Description - Construction - PCC
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
8/9/2005
Author
John M Cyganiewicz
Title
Accountability Report to the Consultant Review Board Report - CRB Meeting Number 6 - RE-Ridges Basin Dam - Animas La Plata Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.;. ',_,-~.lol~~-';!:f;';w.-)yo, '.> <br />.~. '. <br /> <br />. <br /> <br />. <br /> <br /> <br />. <br /> <br />'., ''''''~-'1-)''''~';:~''''-:' <br /> <br />,,~, ".,,> .,... <br /> <br />.-":.~. '. ~;l~:.!.~~~~:~:~~'~t~~/~:-";',;,:~ <br /> <br />001953 <br /> <br />'SiJIVnvIARY STATEMENT <br /> <br />The CRB found the quality of both the design and the construction work completed to <br />date to be excellent. All individuals who participated in our briefing and who conducted <br />our site inspection were knowledgeable of their areas of responsibility and did a good job <br />of presenting information to us. All were completely responsive to our questions, <br />suggestions and discussion. We found the project to be in good technical condition. <br /> <br />As in all projects of this magnitude, planning for future activities is a challenge. We <br />believe, however, that both Reclamation and Weeminuche Construction Authority are <br />progressing satisfactorily. We expect nothing less than satisfactory accomplishment of <br />the technical aspects of this job. <br /> <br />CLOSING COMMENTS <br /> <br />The CRB believes that the foundation and abutment conditions are excellent and concurs <br />with the design changes as presented in amendments 5 and 6 to the dam construction <br />contract documents provided for this meeting. We look forward to the next CRB meeting <br />to review the progress ofproject construction. <br /> <br />We agree with Reclamation's proposal for the next CRB meeting in the summer of2005. <br />This meeting will allow the CRB to inspect gate chamber excavation and stabilization, <br />tunnel lining placement, the progress and results of drilling and grouting, foundation <br />preparation and treatment, and the fill placement of the several zones of the dam. <br /> <br />The CRB appreciates the thorough preparation and presentations by Reclamation staff. <br />This has made our review much easier and more meaningful. <br /> <br />Very truly yours, <br /> <br />Jk ([J~JEb ~t~ <br /> <br />James W. Erwin <br /> <br />David E. Kleiner <br /> <br />Edwin C. Rossillon <br /> <br />Attachments as noted <br /> <br />-7- <br />
The URL can be used to link to this page
Your browser does not support the video tag.