My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC06357
CWCB
>
Water Supply Protection
>
Backfile
>
17000-17999
>
WSPC06357
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:05:36 PM
Creation date
10/9/2006 5:48:48 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106.A.1.b
Description
Colorado River Water Projects - Animas La Plata - Project Description - Construction - PCC
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
8/9/2005
Author
John M Cyganiewicz
Title
Accountability Report to the Consultant Review Board Report - CRB Meeting Number 6 - RE-Ridges Basin Dam - Animas La Plata Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />00193<3 <br /> <br />( <br /> <br />. <br /> <br />D-8311 <br />PRJ-13.00 <br /> <br />To: <br /> <br />MEMORANDUM~ <br />1M E?/<J!z.oos- <br />Perry J. Hensley, Chief I'P' <br />Geotechnical Services Division, Technical Service Center <br /> <br />Through: <br /> <br />Robert L. Dewey <br />Manager, Geotechnical Engineerin <br /> <br />~t:V <br /> <br />From: <br /> <br />John M. Cyganiewicz <br />Team Leader, Ridges Basin <br /> <br /> <br />Subject: <br /> <br />Accountability Report to the Consultant Review Board (CRE) Report, CRB <br />Meeting No.6 - Ridges Basin Dam - Animas-LaPlata Project, Colorado <br /> <br />. <br /> <br />Introduction <br /> <br />The sixth Consultant Review Board (CRE) meeting for the design of Ridges Basin Dam was <br />held on May 16-20,2005. Five previous meetings of the CRB were held in past years. The CRB <br />prepared a report of their findings from the sixth meeting dated June 3, 2005, and a copy is <br />included here in Appendix A. This accountability report addresses comments and <br />recommendations in that report. <br /> <br />As part of the task order for the meeting, Reclamation had requested responses to a series of <br />questions of specific interest. The CRE elected to include responses to each of Reclamation's <br />questions followed by comments of a general nature. This accountability report follows the <br />structure of the CRB report. <br /> <br />The CRE report contained many excellent comments and recommendations. However, only <br />those comments and recommendations that require a response have been extracted from the CRE <br />report and are included below with Reclamation's accountability to each. Reclamation greatly <br />appreciates all of the CRB recommendations. <br /> <br />CRB Recommendations <br /> <br />CRB Recommendation No.1: <br /> <br />'The CRE is of the opinion that both zones 4 and 4B (with plus 7-inch cobbles excluded) placed <br />. against zones 1,2, 2A and 3 will result in a satisfactory contact. Placement techniques should be <br />
The URL can be used to link to this page
Your browser does not support the video tag.