My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC06199
CWCB
>
Water Supply Protection
>
Backfile
>
17000-17999
>
WSPC06199
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:04:55 PM
Creation date
10/9/2006 5:44:38 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8541
Description
San Luis Valley Project
State
CO
Basin
Rio Grande
Water Division
3
Date
7/15/1981
Author
Robert H Weimer
Title
San Luis Valley Project Closed Basin Division - 1980-1981 - Revised Fish and Wildlife Mitigation Plan (June 1981), Closed Basin Division, San Luis Valley Project, Colorado
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />001021 <br /> <br />. <br /> <br />. <br /> <br /> <br />'- <br /> <br />E. CO~l'E:nce Channel Water Hanagement Structures <br /> <br />Three conveyance channel turnout structures each ,.nth a capacity to deliver <br />1,,500 acre-feet per year ,oJill be provided on the Alamosa N"R. One turnout <br />structure will be located near the intersection of the conveyance channel and <br />the Chicago ditch, while a second turnout structure will be near the Hum ditch. <br />Both of these structures will divert waters from the channel by gravity. A <br />third turnout structure loJill be located near the intersection of the conveyance <br />channel and the Denver and Rio Grande railroad. Water diverted from this <br />turnout will have to be punped. <br /> <br />Two conveyance channel turnout struc tures wi th a total capacity of 800 acre-feet <br />per year will be provided on the Blanca HHA. One turnout struc ture will be <br />located on the Blanca mJA on the north edge or: the W. 1/2 sec. 4., T. 38 N., R. <br />12 E.; the second turnout will be located on southern portion of Blanca lfaA near <br />the existing ~lallard 4 pond. Waters from the channel will be diverted by <br />gravity. <br /> <br />F. Replacement of Structures <br /> <br />Some irrigation structures could be affected due to conveyance channel <br />construction through Alamosa N"R. The conveyance channel would cross the <br />Chicago and Hum ditches, two smaller canals, and one road in the Alamosa ~MR. <br />The two ditches and two canals would be siphoned under the conveyance channel, <br />while the channel ,;ould be siphoned under the road. In addition to turnou t <br />structures describ~,d in section E above, a deep artesian well capable of deliv- <br />ering 800 acre-feet of water in 90 days would be provided. Artesian water <br />rights for the deep well would be transferred to Alamosa N"R after Emperious <br />Estate lands are acqnired. A canal west of the third northernmost turnout cOllld <br />be provided if the deep artesian well proved unfeasible. <br /> <br />Apr"r:oximately 4,000 linear" feet or existing dikes and 10 ~waterfoHl nesting <br />islands (which provide waterfowl habitat) will no longer be intensively managed <br />as a result of conveyance channel construction through the Blanca Iffi.A. The <br />project water to be nsed on Blanca mL<\ to mitigate dralo/down pumping effects <br />resulting from the project should be delivered to these affected lands. To <br />accomplish this purpose, approximately 3,400 linear feet of pipe lateral, <br />2,500 linear feet of ditches, and an energy dis>,Lpating pipe outlet structure <br />will be needed to deliver conveyance channel water from the northern turnout"-to <br />affected lands. Approximately 4,000 linear feet of dikes, 1,700 linear feet 00 <br />'-, <br />ditches, 150 linear feet of pipe lateral, and an energy dissipating pipe.ontlet <br />structure will be needed to deliver water to affected lands. Ten duck-nesting .~ <br />islands will also be provided. Funds to accomplish the construction of the <br />above structures will be provided. <br />G. Land and Water Right Acquisition <br /> <br />The west 1/2 sec. 4, T. 38 N., R. 12 E. will be acquired in fee with appurtenant <br />water rights to replace lands lost by conveyance channel construction, severance <br /> <br />16 <br /> <br />"~, <br /> <br />~..~~~r~~"!'Mf2... .. <br /> <br />,.t!!!<J <br /> <br />.,.~~r.::"'f1'.:&~W <br />
The URL can be used to link to this page
Your browser does not support the video tag.