My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC06111
CWCB
>
Water Supply Protection
>
Backfile
>
17000-17999
>
WSPC06111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:21:32 AM
Creation date
10/9/2006 5:42:01 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.700
Description
Colorado River-Colorado River Basin-Colorado River Basin General Publications
State
CO
Date
1/1/3000
Title
Colorado River Documents and Major Events-Sparks Synopsis-July 1976-Issue Area No 1-Revision of Water Resource Planning and Evaluation Criteria and Procedures
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-8- <br /> <br />b. Tighten cost-benefit ratio computation through <br /> <br />uniform, detailed guidelines prepared by: (1) interagency <br /> <br />agreement or (2) independent review board. <br /> <br />c. Have an independent agency or board review project <br /> <br />benefits and costs for accuracy and consistency. <br /> <br />d. Increase cost sharing by project beneficiaries to <br /> <br />discourage the promotion of economically unsound <br /> <br />investments. <br /> <br />e, Remove legislative constraints on computation of <br /> <br />navigation benefits and costs to be more consistent <br /> <br />with,the state of the art and with computation <br /> <br />methods applied to other purposes. <br /> <br />f. Replace or supple2ent the benefit-cost ratio as a <br /> <br />decision criterion with (1) cost-effectiveness to <br /> <br />, <br />achieve non-econonic (social, environmental) goals <br /> <br />in the least costly manner; and/or (2)' maximization <br /> <br />of yield (return on investment) to increase the <br /> <br />economic return au government investments and eliminate <br /> <br />less economically efficient projects, within a limited <br /> <br />Federal budget. <br /> <br />g, Require a cost recovery plan for the vendible products <br /> <br />and services as a part of the project or program <br /> <br />planning process to achieve a more equitable distribution <br /> <br />of costs among the benefici~ries. <br /> <br />-I. ) 'j <br />
The URL can be used to link to this page
Your browser does not support the video tag.