Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />150a <br />irrigation water requirement for a 7,200 AF reservoir and a 4,400 AF <br />reservoir respectively. <br /> <br />Reconnaissance-level layouts were made of a zoned earth embankment <br /> <br /> <br />dam with a cutoff trench 80 feet deep to bedrock for each size of <br /> <br /> <br />reservoir. Both sizes of dam were laid out with a crest width of 25 <br /> <br /> <br />feet. Freeboards of 19 feet for the 7,200 AF reservoir and lB feet <br /> <br /> <br />for the 4,400 AF reservoir above their normal high water surface <br /> <br /> <br />elevations, resulted in crest elevations of 6,065 feet and 6,044, <br /> <br /> <br />respectively. Quantities were estimated for dam embankments having <br /> <br /> <br />3:1 and 2.5:1 upstream and downstream slopes, respectively. The <br /> <br /> <br />internal impervious core zone, upstream transition zone, and filter <br /> <br /> <br />and drain zones were assumed to have upstream and downstream slopes <br /> <br /> <br />of l:l and 0:5.1, respectively, sloped in the upstream direction. <br /> <br /> <br />Foundation preparation would consist of stripping approximately <br /> <br /> <br />five feet below the dam footprint, excavation of a cutoff trench to <br /> <br /> <br />bedrock, grouting both abutments, and constructing a grout curtain <br /> <br /> <br />below the core zone-rock foundation contact. <br /> <br />The conventional outlet works was oversized to accommodate diversion <br /> <br /> <br />of the river during construction. It would be located in either the <br /> <br /> <br />left or right abutment at as Iowan elevation as practical and would <br /> <br /> <br />be founded on rock. The portion of the outlet conduit passing under <br /> <br /> <br />the central core zone would be encased in concrete with cutoff- <br /> <br /> <br />collars to prevent piping along the conduit surface. The outlet <br /> <br /> <br />works inlet structure located in the upstream section of the outlet <br /> <br />34 <br />