Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1503 <br /> <br />MANCOS WATERSHED <br /> <br />TABLE D.9 <br />PRELIMINARY COST COMPARISON OF POTENTIAL STORAGE SITES <br /> <br />Site & Configuration <br />9A 9B 8 5 <br /> <br />Drainage Area - Mi2 <br /> <br />225 225 17 17 <br /> <br />Inflow Design Flood-cfs <br /> <br />38.000 38,000 12,100 9,300 <br /> <br />Total Capacity - AF <br /> <br />7,200 44,300 6,700 6,700 <br /> <br />Height of Dam <br /> <br />110' 205' 228' 225' <br /> <br />Spillway Capacity-cfs <br /> <br />37,400 l,700 1,900 2,300 <br /> <br />Capital Cost - Million$ <br /> <br />$11.2 $l6.0 $23.3 $23.6 <br /> <br />Annual Capital Cost-l000$ <br /> <br />$957 $1,368 $l,985 $2,014 <br /> <br />Annual OM&R - 1000$ <br /> <br />$56 $80 $226 $118 <br /> <br />Total Annual Cost-1000$ <br /> <br />$1,013 $1,448 $2,211 $2,132 <br /> <br />Annual Cost per AF <br /> <br />$132 $188 $287 $277 <br />$338 $438 $738 $71l <br /> <br />Annual Cost per Acre <br /> <br />28 <br />