Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />14~2. <br />TABLE D.5 (continued) <br /> y Crop 2/ Water Residual~/ <br />Parcel Gross Net Pay.Cap-:- Cost Pay.Cap. <br />No. Acres Acres $/ac/yr $/ac/yr $/ac/yr <br />M36l 57 56.4 138 III 27 <br />M362A 6 6 97 318 -221 <br />M362B 26 26 145 124 21 <br />M363 36 36 142 136 6 <br />M364 5 5 90 303 -213 <br />M365 9 9 157 226 -69 <br />M366 6B 67.3 176 111 65 <br /> <br />y <br /> <br />Net acres for parcel, irrigation system, combination <br />resulting in the highest payment capacity. See Appendix 0.1. <br /> <br />"!:./ <br />H <br /> <br />Crop payment capacity from Appendix D.2. <br /> <br />Parcels with positive residual payment capacity were further <br />analyzed for reservoir costs. <br /> <br />17 <br />