Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />D.l <br /> <br />D.2 <br /> <br />D.3 <br /> <br />D.4 <br /> <br /> <br />1473 <br /> <br />TABLE OF CONTENTS <br /> <br />TASK D & E REPORT <br />MANCOS WATERSHED <br /> <br />GENERAL <br /> <br />SELECTION OF PARCELS FOR OFF-FARM DESIGN <br /> <br />OFF-FARM IRRIGATION TRANSMISSION SYSTEM COST <br /> <br />D.3.1 General <br />D.3.2 pumping Stations <br />D.3.3 Pipelines <br />D.3.4 River Diversion Structures <br />D.3.5 Other Costs <br />D.3.6 Other Costs Not Included <br /> <br />PRELIMINARY PRACTICABLE IRRIGABLE ACREAGE <br /> <br />D.4.l Existing Irrigated Lands <br /> <br />D.4.2 Water Supply <br /> <br />D.4.3 Cropping Pattern <br />D.4.4 preliminary PIA Analysis <br /> <br />D.4.5 Adequacy of Streamflows to supply PIA <br /> <br />D.4.6 Potential Storage Sites <br /> <br />D.4.7 Competency of Sites <br /> <br />D.4.8 Flood Hydrology and Spillway Requirements <br /> <br />D.4.9 Final Site Selection <br /> <br />D.4.l0 Simulated River Operations <br /> <br />D.4.11 Water Storage Costs <br /> <br />D.4.l2 Preliminary Practicably Irrigable Acreage <br />Determination <br /> <br />1 <br />2 <br /> <br />4 <br /> <br />4 <br /> <br />5 <br /> <br />5 <br /> <br />5 <br /> <br />8 <br /> <br />8 <br /> <br />9 <br /> <br />9 <br /> <br />9 <br />9 <br /> <br />11 <br /> <br />18 <br /> <br />19 <br />22 <br /> <br />24 <br /> <br />26 <br />29 <br />33 <br /> <br />37 <br />