My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC06079
CWCB
>
Water Supply Protection
>
Backfile
>
17000-17999
>
WSPC06079
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:04:21 PM
Creation date
10/9/2006 5:41:26 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8064.100
Description
Ute Tribes
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
6/1/1987
Author
Boyle Engineering
Title
Agricultural Engineering Study - Mancos Watershed - Task D-E - Final Report - Design-Cost Estimate for Off-Farm Irrigation Facilities and PIA Determination
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1486 <br />D.4.4 Preliminary PIA Analysis <br />A preliminary PIA analysis was performed comparing a parcel's <br /> <br /> <br />payment capacity with a preliminary estimate of the cost to pump <br /> <br /> <br />water from the river to the parcel. This preliminary water cost was <br /> <br /> <br />based on the static pumping lift (the difference in elevation from <br /> <br /> <br />the water surface in the river to the elevation of the parcel) for <br /> <br /> <br />gravity irrigated fields or plus a field delivery pressure of 60 psi <br /> <br /> <br />for sprinkler irrigation. Detailed tabulations of the analysis are <br /> <br /> <br />shown in Appendix 0.1. Table D.4 identifies only those parcels with <br /> <br /> <br />a positive preliminary residual payment capacity requiring further <br /> <br /> <br />consideration. A total of 88 parcels covering 4,343 acres showed a <br /> <br /> <br />positive preliminary residual payment capacity. <br /> <br />An off-farm irrigation transmission system was designed for those <br /> <br /> <br />parcels near the Mancos River showing a positive preliminary <br /> <br /> <br />residual payment capacity shown in Table D.4. Those calculations <br /> <br /> <br />are shown in Appendix 0.2 and summarized in Table D.5. Parcels with <br /> <br /> <br />an initial positive payment capacity after comparing the residual <br /> <br /> <br />payment capacity to the cost of water were analyzed further for the <br /> <br /> <br />abi~ity to justify construction of a reservoir for storage of the <br /> <br /> <br />necessa.ry water supply. A total of 3,385 acres with an on-farm water <br /> <br /> <br />requirement of 7,700 acre-feet was identified in Table 0.5 to have an <br /> <br /> <br />initial positive payment capacity. <br /> <br />Many parcels in the Navajo Wash area had an initial positive payment <br />capacity even though the distance from the river was considerable. <br /> <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.