Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1483 <br /> <br /> <br />D.3.5 Other Costs <br /> <br /> <br />Annual maintenance of major facilities including pipelines, pump <br /> <br /> <br />stations, and river diversions is estimated at 0.5 percent of the <br /> <br /> <br />initial construction cost. <br /> <br />The cost of electrical energy is assumed to be $0.068605/KWhr for the <br />Southern Ute area and $O.065039/KWhr for the Mountain Ute area. <br />These are commercial user rates being charged during the first half <br />of 1985. A detailed discussion of the power costs was previously <br />prov id ed . <br /> <br />D.3.6 Other Costs not Included <br /> <br /> <br />Other known costs which could be considered are costs for access <br /> <br /> <br />roads to the pump stations, right-of-way costs where pipelines or <br /> <br /> <br />pump stations may be on non-Indian land, and costs to provide <br /> <br /> <br />electric power service to the pump station. These costs are either <br /> <br /> <br />minor and/or difficult to estimate with available information. <br /> <br /> <br />Therefore, for these preliminary analyses, they have not been <br /> <br /> <br />considered at this time. <br /> <br />~ <br /> <br />The cost of power line extensions to serve pumping facilities could <br /> <br /> <br />be quite high, especially if three phase power is required. Three <br /> <br /> <br />phase power will be required for pump stations over 25 horsepower. <br /> <br />B <br />