My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC06079
CWCB
>
Water Supply Protection
>
Backfile
>
17000-17999
>
WSPC06079
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:04:21 PM
Creation date
10/9/2006 5:41:26 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8064.100
Description
Ute Tribes
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
6/1/1987
Author
Boyle Engineering
Title
Agricultural Engineering Study - Mancos Watershed - Task D-E - Final Report - Design-Cost Estimate for Off-Farm Irrigation Facilities and PIA Determination
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1483 <br /> <br /> <br />D.3.5 Other Costs <br /> <br /> <br />Annual maintenance of major facilities including pipelines, pump <br /> <br /> <br />stations, and river diversions is estimated at 0.5 percent of the <br /> <br /> <br />initial construction cost. <br /> <br />The cost of electrical energy is assumed to be $0.068605/KWhr for the <br />Southern Ute area and $O.065039/KWhr for the Mountain Ute area. <br />These are commercial user rates being charged during the first half <br />of 1985. A detailed discussion of the power costs was previously <br />prov id ed . <br /> <br />D.3.6 Other Costs not Included <br /> <br /> <br />Other known costs which could be considered are costs for access <br /> <br /> <br />roads to the pump stations, right-of-way costs where pipelines or <br /> <br /> <br />pump stations may be on non-Indian land, and costs to provide <br /> <br /> <br />electric power service to the pump station. These costs are either <br /> <br /> <br />minor and/or difficult to estimate with available information. <br /> <br /> <br />Therefore, for these preliminary analyses, they have not been <br /> <br /> <br />considered at this time. <br /> <br />~ <br /> <br />The cost of power line extensions to serve pumping facilities could <br /> <br /> <br />be quite high, especially if three phase power is required. Three <br /> <br /> <br />phase power will be required for pump stations over 25 horsepower. <br /> <br />B <br />
The URL can be used to link to this page
Your browser does not support the video tag.