Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1,.4q\ <br /> <br />MANCOS WATERSHED <br /> <br />TABLE D.l <br />PIPELINE COSTS <br /> <br /> y <br />Pipe Installed Cost - Sift <br />Diamet. lOO 150 200 250 300 350 <br />(inch) psi psi psi psi psi psi <br />4 10.50 ll. 00 11. 50 l2.00 l2.50 13.00 <br />6 12.00 l2.50 13.00 14 .00 14.50 15.00 <br />8 15.50 16.00 17.00 17.50 18.50 20.00 <br />lO 20.00 21. 00 22.50 23.50 25.00 26.50 <br />12 24.00 26.50 28.50 31.00 33.00 35.00 <br />l4 28.50 32.00 35.00 38.00 41. 00 44.00 <br />15 31.00 34.50 38.50 42.50 45.50 49.00 <br />16 34.00 37.50 42.00 46.00 50.00 54.00 <br />l8 4l.00 45.00 50.00 54.00 59.50 65.00 <br />20 48.50 53.00 58.00 63.50 69.00 75.00 <br />21 50.50 55.50 60.50 66.00 71. 50 77.00 <br />24 62.00 69.00 75.50 82.00 88.50 95.50 <br />27 75.50 82.00 88.50 96.50 104.00 112.00 <br />30 89.50 96.50 103.00 111.00 120.00 128.50 <br />33 104.50 111. 00 116.50 126.50 137.50 l48.50 <br />36 115.50 122.00 130.50 142.00 155.00 l66.00 <br />48 150.00 164.00 <br />54 184.00 206.00 <br />60 222.00 230.00 <br />66 260.00 304.00 <br />72 296.00 332.00 <br />78 335.00 360.00 <br />102 580.00 <br /> <br />y <br /> <br />Unit construction cost including 10% allowance for <br />-appurtenances. <br /> <br />6 <br />