Laserfiche WebLink
<br />10/08/96 15:20 <br />'("e 0003~O <br />October 8, 1996 <br /> <br />BOYLE ENGINEERING ~ 303 866 4474 <br /> <br />NO. 957 <br /> <br />Page 2 <br /> <br />However, the summe? demand is constrained in the model by the decreed amount, so the summer ' <br />instream flow right would never be simulated. The State pointed out that we should verify that the <br />database supports the summer demand before making changes to the ifr file. Boyle bas determined that <br />the two rights in question arc the E. Williams Fork and Williams Fork rights discussed above, which are <br />not in the database at all Therefore. Boyle will modify the decreed amount in the . 1ft file as a hand edit <br />and document. <br /> <br />DN.cn,lOl-D2lmr <br /> <br />1;103 <br /> <br />I <br />m <br /> <br />11 <br />.i <br />