My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC05982
CWCB
>
Water Supply Protection
>
Backfile
>
17000-17999
>
WSPC05982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:03:52 PM
Creation date
10/9/2006 5:35:41 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8541
Description
San Luis Valley Project
State
CO
Basin
Rio Grande
Water Division
3
Date
6/1/1982
Title
San Luis Valley Project Closed Basin Division - 1982 - Fish and Wildlife Report for the Closed Basin Division, San Luis Valley Project, Colorado
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I,"" : <br />I <br /> <br />-" .,,'" ":'"--<,'. <br /> <br />. ':.'~:'-'-~"~- '.. <br /> <br />"". ., <br /> <br />--'-- <br /> <br /> <br />OOl1911 , <br /> <br />United States Department of the Interior <br /> <br />FISH AND WILDLIFE SERVICE <br />AREA OFFICE COLORADO-UTAH <br />1311 FEDERAL BUILDING <br />125 SOUTH STATE STREET <br />SALT LAKE CITY, UTAH 84138 <br /> <br />IN REPLY REFER TO: <br /> <br />MEMORANDUM <br /> <br />~ ;1 <br />'- <br /> <br /> <br />Q <br /> <br />To: Regional Director, Bureau of Reclamation, <br />Southwest Region, Amarillo, Texas <br /> <br />From: Acting Area Manager, Fish and Wildlife Service, <br />Salt Lake City, Utah <br /> <br />Subject: Closed Basin Division, San Luis Valley Project, Colorado <br />Revised Fish and Wildlife Coordination Act Report <br /> <br />~ <br /> <br />This memorandum constitutes our revised Fish and Wildlife Coordination Act <br />Report on the subject project, The attached substantiating report presents <br />the same coverage but in greater detail, Previous reports on this project, <br />by our Service, include one dated December 9, 1960 and supplements to that <br />report dated June 24, 1963 and May 20, 1968, Our most recent reports dated <br />September 10, 1969 and October 28, 1969 dealt with the water salvage system <br />and the Rio Grande channel rectification respectively. On May 26, 1977, an <br />advance planning aid memorandum on the project was provided your agency, <br /> <br />It recently became apparent that a revised report would be necessary due to <br />the following: 1) changes in project design, 2) additional wildlife data <br />(wetland inventory) is available that was not available in the most recent <br />report, 3) the mitigation proposal (Mishak Refuge) is no longer valid, and, <br />4) mitigation for the BLM Blanca Wildlife Habitat area was not previously <br />considered. This report supersedes all previous reports and memoranda on <br />this project, <br /> <br />Li ke the earl i er reports, thi s report has been prepared in cooperati on with the <br />Colorado Division of Wildlife and under the authority and in accordance with <br />the provisions of the Fish and Wildlife Coordination Act (48 Stat 401 as amended; <br />16 U,S.C, 661 et. seq.). Concurrence in the report by the Colorado Division of <br />Wildlife is indicated by the attached copy of a letter dated April 1,1982, <br />signed by Director, Jack R. Grieb. Material from this report will be used in <br />the Supplemental Environmental Impact Statement on this project, The cooperation <br />of your agency in the studies and preparation of this report is greatly appre- <br />ciated. <br /> <br />~ <br /> <br />(1 <br />L' <br /> <br />- I <br />
The URL can be used to link to this page
Your browser does not support the video tag.