Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />1571 <br /> <br />UPPER COLORADO RIVER BASIN <br />CRS? AND PAR'r(CIPNfING UNI'rS <br /> <br />GENERATING UNITS <br /> <br />Name ____,__________________Loc:,!!!:.i~r.!..___,__________ Capacity (~98?J..l <br /> <br />Fontenelle Wyoming 10 MW <br />Flaming Gorge Wyoming 108 MW <br />Blue Mesa Colorado 60 MW <br />Morrow Point Colorado 120 MW <br />Crystal Colo[,iJUO 211 MW <br />Glenn Canyon Ariz/Utah 1,021 MW <br /> <br />GENERATIO~ (Historical) <br /> <br />Year <br /> <br />1982 <br />1981 <br />1980 <br /> <br />5.0 Million Kwh <br />5.0 Million Kwh <br />6.6 Million Kwh <br /> <br />GENERATION (Future) 2 <br />1983-2090 -- 5-6 Million Kwh <br /> <br />POWER RATES <br />-------- <br /> <br />Year <br /> <br />Composite Rate <br /> <br />FY 1962 <br />FY 1974 <br />FY 1977 <br />FY 1981 (Present)3 <br />FY 1983 (proposed)4 <br /> <br />6.00 Mills /Kwh <br />6.11 Mills/Kwh <br />6.55 Mills/Kwh <br />7.89 Mills/Kwh <br />9.9~ Mills/Kwh <br /> <br />1 Capacity at various units will be uprated in the future. <br />2 Will depend on hydrologic conditions & Upper Basin depletions <br />3 Rate had been rejected by FERC <br />4 Rate subject to approval by PC:RC <br /> <br />526 <br />ucrb <br />