<br />The Poudre Supply Csnsl. ospaoity of 1.500 ssoond feet. has its
<br />hesdin~ in Horsetcoth Res~rvoir throu~h an outlet works in Horsetooth Dam.
<br />
<br />
<br />Beginning at traverse Station No. 1 of the outlet works, ssid station being
<br />
<br />
<br />the ssme point as Station 6 164.37 of the dam axis. from whioh point the SE
<br />
<br />
<br />Cor. of Sec. 6, T. 7 N., R. 69 W., 6th Prinoipal Meridian bears S. 730 09t' E.
<br />
<br />
<br />a distance of 5,2611.5 feet; the Poudre Supply Canal extends in a northerly
<br />
<br />
<br />direction for a distance of 5.2 miles to the point of discharge into the Caohe
<br />
<br />
<br />la Poudre River, whioh point is traverse Station No. 66 and bears S. 190 5&}'
<br />
<br />
<br />E. a distance of 3,951.2 feet from the NW Cor. of Sec. 14, T. 8 N.. R. 70 w.,
<br />
<br />
<br />6th Principal Meridian (Sheet 7, Exhibit C).
<br />
<br />
<br />The North Poudre Supply Canal (Gravity Plan), capaoity of 250 seoond
<br />
<br />
<br />feet, has its beginning in the Cache la Poudre River. traverse Station No.1
<br />
<br />
<br />being the headworks, and from which point the HE Cor. of Sec. 5, T. 6 N.,
<br />
<br />
<br />R. 70 N., 6th Principal Meridian, bears N. 700 15' E., a distance of 2,460
<br />
<br />
<br />feet. The oanal, oonsisting of various seotion including tunnele, siphons,
<br />
<br />
<br />olosed conduits, ~d open oansl, extends in a northeasterly direotion for a
<br />
<br />
<br />distanoe of 12.0 miles to a point of disoharge into the North poudre Ditoh,
<br />
<br />
<br />.aid point being t~verse Station No. 20 and whioh point bears S. 710 30' E.,
<br />
<br />
<br />a distance of 650 reet from the NW Cor. of Sec. 9, T. 9 N., R. 69 W., 6th
<br />
<br />
<br />Principal Meridian (Sheet 7, Exhibit C).
<br />
<br />
<br />The Pumping Plant Flan, oapaoity of 250 seoond feet. an alternate
<br />
<br />
<br />to the Gravity Plan. has its beginning in Seotion 14, T. 8 N., R. 70 W.,
<br />
<br />
<br />6th Principal Meridian, at the end of the Poudre Supply Canal. Project water
<br />
<br />
<br />is siphoned aoross the Poudre River and empties into Poudre Valley and Reser-
<br />
<br />
<br />voir Co. Canal, Which is to be enlarged to convey water to a pumping plant
<br />
<br />
<br />in Seotion 16, T. 6 N., R. 69 W., whioh will lift the water 182 feet to a
<br />
<br />
<br />gravity canal. The gravity csnal will run in a northerly direotion for three
<br />
<br />
<br />miles to coinoide with the North Poudre Supply Canal (Gravity Plan) in the SEi
<br />
<br />
<br />of Seotion 31, T. 8 N., R 69 W., as shown on Sheet 7, Exhibit C.
<br />
<br />
<br />At the aforementioned points of delivery, in the Caohe la Poudre, Big
<br />
<br />
<br />and Little Thompson Rivensend the North Poudre Canal, projeot waters are delivered
<br />
<br />
<br />to the Northern Colorado Water Conservanoy Distriot for adminiatration end delivery
<br />
<br />2635