Laserfiche WebLink
<br />. <br /> <br />FUTURE CONSIDERATIONS/CONDITIONS PRECEDENT TO <br />CONSTRUCTION <br /> <br />Before construction could begm 00 lining the Hammond Project :-'1ain Canal. <br />a cooperatiye agreement would need to be finalized between the United <br />States and the Bloomfield Refinery. The agreement, as detailed in <br />attachment D, would outline involvement and responsibilities in the <br />construction of the canal lining. It would specify the proper removal and <br />disposal of the hydrocarbon- contaminated soils in the Main Canal from the <br />RefLDery, delineate the associated cost.sharing obligations. and specify the <br />type of lining material to be used. <br /> <br />In addition. a contract would be requIred with the Hammond Conservancy <br />District _to assure the continued proper operation and maintenance of the <br />lined facilities and to insure that they would be operated in a manner so <br />that the planned salinity reduction would be realized. <br /> <br />. <br /> <br /> <br />"'" ^~~... ',- ~~ <br />~ -' <br />, , <br />~ c <br />.... <br /> <br />/~' <br />Existing lined section ~foreground. unlined in background. <br /> <br />. <br /> <br />S.11 <br />