<br />C[2355 <br /> <br />~ ------- - - ~-----~- <br /> <br />Table S-4.-Cost effectiveness of the viable alternatives <br /> <br />'\ <br /> <br />Canal Lining <br /> <br />Pressure Pipe <br />aO-foot head) <br /> <br />Pressure Pipe <br />(100.foot head) <br /> <br />Capital costs I <br />Construction cost <br />IDC <br />Capital investmen t <br />Annual investment <br />Annual OMR&E (increase) <br />Total annual cost <br />Tons of salt removed <br />Cost per ton <br /> <br />$10,493,000 <br />1,237.000 <br />$11,730,000 <br />1,014,180 <br />o <br />$1,014,180 <br />27,700 <br />$36.61 <br /> <br />1 Preauthorization and archeological costs excludf"-" <br /> <br />$12,098,000 <br />1.434.000 <br />$13,532,000 <br />1,170,050 <br />390.000 <br />$1,560,050 <br />18,400 <br />$84.78 <br /> <br />$14,145,000 <br />1.678.000 <br />$15,823,000 <br />1,368,110 <br />559.000 <br />$1,927,110 <br />18,400 <br />$104,73 <br /> <br />PROJECT SCHEDULE <br /> Table S-5.-Schedule <br /> Program item Quantity Estimate.l 1st year 2nd year 3rd year <br /> Total <br />Line <br />No. 2 3 4 5 6 <br /> Desi~ Construction <br />2 Construction <br />3 Hammond Canal <br /> concrete lining <br />4 Main Canal 19.52 mi $9,047,000 $835,000 $5,700.000 $2,512,000 <br />5 Gravity extension 3.94 mi 787,000 73,000 714,000 <br />6 East Highline 2,30 mi 469,000 43,000 426,000 <br />7 West Highline 0.97 mi 190,000 18,000 172,000 <br />8 Fish & wildlife <br /> mitigation <br />9 (Subtotal) 10,493,000 969,000 7.012,000 2,512,000 <br />10 Interest during <br /> construction 26.73 mi 1,237,000 219,000 913,000 105,000 <br />11 Total construction <br /> cost 11,730,000 1,188,000 7,925,000 2,617,000 <br /> <br />S-8 <br />