Laserfiche WebLink
<br />('. <br /> <br />00lG8~ <br /> <br />35.11 <br /> <br />WATER INFORMATION MANAGEMENT SYSTEM HANDBOOK <br /> <br />35 - MONITORING. Before montioring begins, develop a montioring plan and <br />lU\ve it approved by the appropriate line officer. <br /> <br />35.1 - Contents of Monitoring Plans. Answer the following questions when <br />designing monltoring plans: <br /> <br />.1. Are the dimensions of the active channel stable with flow over time? <br /> <br />2. Is sediment, both in size and volume, being distributed and <br />transported in such a way as to prevent either aggradation or degradation? <br /> <br />3. Are the bed and banks stable? <br /> <br />IO No. 1 <br />9/10/85 <br />